Catalogue / Live-line & hot-line washing

No photo yet

Substation insulator hot washing, Xtra 9 seriesSample

by Magadh Logistics (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Magadh Logistics (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

Magadh Xtra 9 substation insulator hot washing, offered in 3 voltage level options from 132 kV to 400 kV. Design: pre-wash contamination assessment, utility permit coordination and reduced flashover risk in polluted areas. Typically used for coastal and industrial pollution zones, substations in dusty regions and renewable evacuation lines. Delivered in line with IEC 60815, CEA (Measures relating to Safety) Regulations and IEEE 957. Mobilisation Permit based scheduling; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Magadh
Model
MAG-AF9 series
Listing type
Service
Unit
job
Minimum order
1 job
Lead time
Permit based scheduling
Warranty
As per contract
Standards
IEC 60815, CEA (Measures relating to Safety) Regulations, IEEE 957
Delivers to
All India and export (SAARC, Middle East, Africa)
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Voltage level132 kVMAG-AF9-01Voltage level: 132 kV1 job · Permit based schedulingfor verified buyers
Voltage level220 kVMAG-AF9-02Voltage level: 220 kV1 job · Permit based schedulingfor verified buyers
Voltage level400 kVMAG-AF9-03Voltage level: 400 kV1 job · Permit based schedulingfor verified buyers

Specifications

Voltage level132 kV to 400 kV (see variants)
MethodDry ice blastingmade to order: Pressurised water jet / Robotic cleaning / Drone washing
Resistivity of waterDemineralised watermade to order: Above 5000 ohm-cm
ScopePer baymade to order: Per tower / Per km of line
FrequencyQuarterly in coastal areasmade to order: Pre-monsoon / Pre- and post-monsoon
CrewLinemen with insulated platform
ToolsBucket with insulated boommade to order: Insulated hot sticks, bucket truck
SafetyApproved method statement
OutputsPhoto log of insulatorsmade to order: Pre and post leakage current
Productivity100 insulators per daymade to order: 30 towers per day
LicenceTrained under utility protocolsmade to order: Authorised live-line workers

BARREL: Bharat Atom Renewable Resources Energy Limited