Catalogue / Steam turbines & condensers
Back-pressure steam turbine, Max seriesSample
by Magadhsetu Boilers (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Magadhsetu Boilers (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
The Max range of back-pressure steam turbine by Magadhsetu covers 6 output options (5 MW to 250 MW). Key features: turning gear and lube oil system included, electro-hydraulic governing system and efficient blade profiles with high efficiency. Typically used for captive power plants, sugar cogeneration and waste heat to power. Designed and tested to IEC 60045, IS 4351 and HEI standards. Lead time 8-12 months; delivers to East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Magadhsetu
- Model
- MAG-222 series
- Listing type
- Product
- Unit
- nos
- Minimum order
- 10 nos
- Lead time
- 8-12 months
- Warranty
- 12 months
- Standards
- IEC 60045, IS 4351, HEI standards
- Delivers to
- East & North-East India
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- Drum / reel with end caps
- Delivery terms
- Ex-works, freight extra at actuals
- Returns
- No returns on made-to-order items
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Output5 MWMAG-222-01 | Output: 5 MW | 10 nos · 8-12 months | for verified buyers |
| Output12 MWMAG-222-02 | Output: 12 MW | 10 nos · 8-12 months | for verified buyers |
| Output30 MWMAG-222-03 | Output: 30 MW | 10 nos · 8-12 months | for verified buyers |
| Output60 MWMAG-222-04 | Output: 60 MW | 10 nos · 8-12 months | for verified buyers |
| Output120 MWMAG-222-05 | Output: 120 MW | 10 nos · 14-20 months | for verified buyers |
| Output250 MWMAG-222-06 | Output: 250 MW | 10 nos · 14-20 months | for verified buyers |
Specifications
| Output | 5 MW to 250 MW (see variants) |
|---|---|
| Turbine type | Condensingmade to order: Back-pressure / Extraction |
| Inlet steam | 45 ata / 440 Cmade to order: 67 ata / 485 C / 130 ata / 535 C |
| Speed | 5500 rpm with gearbox |
| Exhaust pressure | 8 ata |
| Condenser type | Shell and tube |
| Tube material | Admiralty brassmade to order: SS 304 |
| Governing | Electro-hydraulic |
| Generator coupling | Gearbox |
| Extraction | Single |
| Lube oil system | AC and DC driven pumps |