Catalogue / Resource assessment (solar, wind, hydro)

No photo yet

Wind resource assessment with met mast, Flex 7 seriesSample

by Magadh Technical Services (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Magadh Technical Services (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Wind resource assessment with met mast from Magadh, Flex 7 series: 4 measurement duration options between Desktop study and 12 months. Highlights: extreme wind and wake studies, data quality control and filling and independent bankable estimate. Typically used for wind and solar developers, hybrid project planners and lenders needing P90. Delivered in line with IEC 61400-12-1, IEC 61724-1 and IEC 61400-15. Mobilisation Campaign 3-24 months; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Magadh
Model
MAG-CB2 series
Listing type
Service
Unit
report
Minimum order
1 report
Lead time
Campaign 3-24 months
Warranty
Data availability guarantee above 95%
Standards
IEC 61400-12-1, IEC 61724-1, IEC 61400-15
Delivers to
All India and export (SAARC, Middle East, Africa)
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Measurement durationDesktop studyMAG-CB2-01Measurement duration: Desktop study1 report · Campaign 3-24 monthson quote
Measurement duration3 monthsMAG-CB2-02Measurement duration: 3 months1 report · Campaign 3-24 monthson quote
Measurement duration6 monthsMAG-CB2-03Measurement duration: 6 months1 report · Campaign 3-24 monthson quote
Measurement duration12 monthsMAG-CB2-04Measurement duration: 12 months1 report · Campaign 3-24 monthson quote

Specifications

Measurement durationDesktop study to 12 months (see variants)
TechnologySmall hydromade to order: Solar GHI/DNI / Wind
Data sourceOn-site measurement
Equipment80-120 m met mast with LiDARmade to order: Class A pyranometer station
UncertaintyBankable assessmentmade to order: P50/P90 with uncertainty budget
ModellingPVsyst, SAM
DeliverableResource reportmade to order: Hourly time series dataset
CalibrationCalibration pre and post campaign
Site countSingle sitemade to order: Multi-site comparison
MaintenanceRemote health checks
TurnaroundReport in 3 weeksmade to order: Report within 6 weeks of data

BARREL: Bharat Atom Renewable Resources Energy Limited