Catalogue / Grid connectivity & GNA applications
Connectivity application to STU, Flex seriesSample
by Magadh Technical Services (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Magadh Technical Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Connectivity application to STU from Magadh, Flex series: 4 capacity applied options between 100 MW and 1000 MW. Design: handling of CTU queries, bank guarantee timeline tracking and eligibility check before filing. Typically used for green hydrogen projects, storage developers and renewable developers. Delivered in line with CERC (Connectivity and General Network Access) Regulations 2022, CEA (Technical Standards for Connectivity) Regulations and Indian Electricity Grid Code. Mobilisation Grant 3-9 months; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Magadh
- Model
- MAG-667 series
- Listing type
- Service
- Unit
- application
- Minimum order
- 1 application
- Lead time
- Grant 3-9 months
- Warranty
- As per contract
- Standards
- CERC (Connectivity and General Network Access) Regulations 2022, CEA (Technical Standards for Connectivity) Regulations, Indian Electricity Grid Code
- Delivers to
- All India and export (SAARC, Middle East, Africa)
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Capacity applied100 MWMAG-667-01 | Capacity applied: 100 MW | 1 application · Grant 3-9 months | for verified buyers |
| Capacity applied250 MWMAG-667-02 | Capacity applied: 250 MW | 1 application · Grant 3-9 months | for verified buyers |
| Capacity applied500 MWMAG-667-03 | Capacity applied: 500 MW | 1 application · Grant 3-9 months | for verified buyers |
| Capacity applied1000 MWMAG-667-04 | Capacity applied: 1000 MW | 1 application · Grant 3-9 months | for verified buyers |
Specifications
| Capacity applied | 100 MW to 1000 MW (see variants) |
|---|---|
| Application | GNAmade to order: Connectivity / Both |
| Scope | Document preparation and filing |
| Bank guarantee | Arranged through partner bank |
| Studies | Detailed power system study |
| Portal handling | CTUIL portalmade to order: STU portal |
| Team | Regulatory lead and engineermade to order: Dedicated manager |
| Timeline | Filing in 2 weeksmade to order: Approval 3-6 months |
| Technical documents | Switchyard layout and GA drawings |
| Queries | Until grant |
| Fee basis | Fixedmade to order: Fixed plus success |