Catalogue / Resource assessment (solar, wind, hydro)
Wind resource assessment with met mast, Xtra 3 seriesSample
by Magadh Technical Services (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Magadh Technical Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Wind resource assessment with met mast from Magadh, Xtra 3 series: 4 measurement duration options between 6 months and 24 months. Key features: extreme wind and wake studies, turbine and module selection input and loss factors for local conditions. Typically used for wind and solar developers, lenders needing P90 and state agencies mapping resource. Delivered in line with IEC 61400-12-1, IEC 61724-1 and IEC 61400-15. Mobilisation Campaign 3-24 months; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Magadh
- Model
- MAG-CB4 series
- Listing type
- Service
- Unit
- report
- Minimum order
- 1 report
- Lead time
- Campaign 3-24 months
- Warranty
- Data availability guarantee above 95%
- Standards
- IEC 61400-12-1, IEC 61724-1, IEC 61400-15
- Delivers to
- All India and export (SAARC, Middle East, Africa)
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Measurement duration6 monthsMAG-CB4-01 | Measurement duration: 6 months | 1 report · Campaign 3-24 months | for verified buyers |
| Measurement duration12 monthsMAG-CB4-02 | Measurement duration: 12 months | 1 report · Campaign 3-24 months | for verified buyers |
| Measurement duration18 monthsMAG-CB4-03 | Measurement duration: 18 months | 1 report · Campaign 3-24 months | for verified buyers |
| Measurement duration24 monthsMAG-CB4-04 | Measurement duration: 24 months | 1 report · Campaign 3-24 months | for verified buyers |
Specifications
| Measurement duration | 6 months to 24 months (see variants) |
|---|---|
| Technology | Small hydromade to order: Solar GHI/DNI / Wind |
| Data source | Satellite and reanalysismade to order: On-site measurement / Hybrid with MCP |
| Equipment | 80-120 m met mast with LiDARmade to order: Class A pyranometer station |
| Uncertainty | Bankable assessment |
| Modelling | WAsP, WindPROmade to order: PVsyst, SAM |
| Deliverable | Resource report |
| Calibration | Traceable calibrationmade to order: Calibration pre and post campaign |
| Site count | Multi-site comparison |
| Maintenance | Remote health checks |
| Turnaround | Report in 3 weeksmade to order: Report within 6 weeks of data |