Catalogue / Civil & foundation works

No photo yet

Pile foundations for module mounting structures, Core seriesSample

by Mahabaleshwarflux Engineering Services (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Mahabaleshwarflux Engineering Services (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

Pile foundations for module mounting structures from Mahabaleshwarflux, Core series: 6 works volume options between 1 MW equivalent and 100 MW equivalent. Design: pile layout tolerance maintained to design, monsoon-ready drainage planning and cube and pile test records. Typically used for wind farms, solar parks and industrial plants. Delivered in line with IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations) and IS 1893 (Seismic Design). Mobilisation Mobilisation in 10 days; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Mahabaleshwarflux
Model
MAH-1C5 series
Listing type
Service
Unit
job
Minimum order
1 job
Lead time
Mobilisation in 10 days
Warranty
Pile load test certified
Standards
IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations), IS 1893 (Seismic Design)
Delivers to
All India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Works volume1 MW equivalentMAH-1C5-01Works volume: 1 MW equivalent1 job · Mobilisation in 10 daysfor verified buyers
Works volume5 MW equivalentMAH-1C5-02Works volume: 5 MW equivalent1 job · Mobilisation in 10 daysfor verified buyers
Works volume10 MW equivalentMAH-1C5-03Works volume: 10 MW equivalent1 job · Mobilisation in 10 daysfor verified buyers
Works volume25 MW equivalentMAH-1C5-04Works volume: 25 MW equivalent1 job · Mobilisation in 10 daysfor verified buyers
Works volume50 MW equivalentMAH-1C5-05Works volume: 50 MW equivalent1 job · 4-12 weeks executionfor verified buyers
Works volume100 MW equivalentMAH-1C5-06Works volume: 100 MW equivalent1 job · 4-12 weeks executionfor verified buyers

Specifications

Works volume1 MW equivalent to 100 MW equivalent (see variants)
Foundation typeDriven steel pilemade to order: Ramming or screw pile / RCC bored pile / Raft or isolated footing
Concrete gradeM40 for turbine foundation
Pull-out testing2% piles testedmade to order: Random test plus lateral load
ReinforcementFe 500D TMT
Roads and drainageNot included
BoundaryChain link fence 2.4 mmade to order: Compound wall with barbed wire
QualityCube test reports per pourmade to order: NABL lab testing of materials
MachineryBatching plant at site
Duration4-8 weeks
Payment termsMeasured running billsmade to order: Item rate with retention

BARREL: Bharat Atom Renewable Resources Energy Limited