Catalogue / Civil & foundation works
Pile foundations for module mounting structures, Core seriesSample
by Mahabaleshwarflux Engineering Services (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Mahabaleshwarflux Engineering Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Pile foundations for module mounting structures from Mahabaleshwarflux, Core series: 6 works volume options between 1 MW equivalent and 100 MW equivalent. Design: pile layout tolerance maintained to design, monsoon-ready drainage planning and cube and pile test records. Typically used for wind farms, solar parks and industrial plants. Delivered in line with IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations) and IS 1893 (Seismic Design). Mobilisation Mobilisation in 10 days; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Mahabaleshwarflux
- Model
- MAH-1C5 series
- Listing type
- Service
- Unit
- job
- Minimum order
- 1 job
- Lead time
- Mobilisation in 10 days
- Warranty
- Pile load test certified
- Standards
- IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations), IS 1893 (Seismic Design)
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Works volume1 MW equivalentMAH-1C5-01 | Works volume: 1 MW equivalent | 1 job · Mobilisation in 10 days | for verified buyers |
| Works volume5 MW equivalentMAH-1C5-02 | Works volume: 5 MW equivalent | 1 job · Mobilisation in 10 days | for verified buyers |
| Works volume10 MW equivalentMAH-1C5-03 | Works volume: 10 MW equivalent | 1 job · Mobilisation in 10 days | for verified buyers |
| Works volume25 MW equivalentMAH-1C5-04 | Works volume: 25 MW equivalent | 1 job · Mobilisation in 10 days | for verified buyers |
| Works volume50 MW equivalentMAH-1C5-05 | Works volume: 50 MW equivalent | 1 job · 4-12 weeks execution | for verified buyers |
| Works volume100 MW equivalentMAH-1C5-06 | Works volume: 100 MW equivalent | 1 job · 4-12 weeks execution | for verified buyers |
Specifications
| Works volume | 1 MW equivalent to 100 MW equivalent (see variants) |
|---|---|
| Foundation type | Driven steel pilemade to order: Ramming or screw pile / RCC bored pile / Raft or isolated footing |
| Concrete grade | M40 for turbine foundation |
| Pull-out testing | 2% piles testedmade to order: Random test plus lateral load |
| Reinforcement | Fe 500D TMT |
| Roads and drainage | Not included |
| Boundary | Chain link fence 2.4 mmade to order: Compound wall with barbed wire |
| Quality | Cube test reports per pourmade to order: NABL lab testing of materials |
| Machinery | Batching plant at site |
| Duration | 4-8 weeks |
| Payment terms | Measured running billsmade to order: Item rate with retention |