Catalogue / Cabling, trenching & HDD works
Horizontal directional drilling for road and rail crossings, Elite seriesSample
by Mahabaleshwarflux Engineering Services (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Mahabaleshwarflux Engineering Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Horizontal directional drilling for road and rail crossings from Mahabaleshwarflux, Elite series: 5 cable route length options between 2 km and 50 km. Key features: dewatering in high water table, drum handling and pulling tension control and traffic management at crossings. Used by industrial plant cabling, railway and highway crossings and renewable plant internal networks. Delivered in line with IS 1255 (Cable Installation), IS 7098 (XLPE Cables) and IEC 60840. Mobilisation Mobilisation in 7 days; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Mahabaleshwarflux
- Model
- MAH-C88 series
- Listing type
- Service
- Unit
- km
- Minimum order
- 1 km
- Lead time
- Mobilisation in 7 days
- Warranty
- Restoration warranty 6 months
- Standards
- IS 1255 (Cable Installation), IS 7098 (XLPE Cables), IEC 60840
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Cable route length2 kmMAH-C88-01 | Cable route length: 2 km | 1 km · Mobilisation in 7 days | for verified buyers |
| Cable route length5 kmMAH-C88-02 | Cable route length: 5 km | 1 km · Mobilisation in 7 days | for verified buyers |
| Cable route length10 kmMAH-C88-03 | Cable route length: 10 km | 1 km · Mobilisation in 7 days | for verified buyers |
| Cable route length20 kmMAH-C88-04 | Cable route length: 20 km | 1 km · Permits may extend timeline | for verified buyers |
| Cable route length50 kmMAH-C88-05 | Cable route length: 50 km | 1 km · Permits may extend timeline | for verified buyers |
Specifications
| Cable route length | 2 km to 50 km (see variants) |
|---|---|
| Method | Open trenchmade to order: Trenchless HDD / Trench plus HDD for crossings |
| HDD capacity | Up to 450 mm bore |
| Trench depth | 0.9 mmade to order: 1.2 m / 1.5 m |
| Cable type | LT armoured |
| Jointing | Heat shrinkmade to order: Cold shrink / Premoulded |
| Restoration | Backfill and compaction onlymade to order: Road and footpath restoration |
| Permissions | Contractor arranges road cut approvals |
| Testing | Hipot and sheath testmade to order: Insulation and VLF test |
| Productivity | 50 m per day HDDmade to order: 300 m per day open trench |
| Crew | HDD crew of 8 with rigmade to order: Trenching team of 15 |