Catalogue / Installation & erection

No photo yet

Module mounting structure and PV module installation, Xtra 2 seriesSample

by Mahabaleshwarflux Engineering Services (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Mahabaleshwarflux Engineering Services (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

The Xtra 2 service of module mounting structure and PV module installation by Mahabaleshwarflux covers 3 installation scope options (50 MW to 200 MW). Key features: punch list closure before testing, mobile team available for remote sites and torque-verified structure and module fixing. Suited to utility solar parks, c&I rooftop and ground mount and wind farm substations. Delivered in line with IS 732 (Electrical Wiring), IEC 62548 and CEA (Measures relating to Safety) Regulations. Mobilisation Start after material at site; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Mahabaleshwarflux
Model
MAH-723 series
Listing type
Service
Unit
MW
Minimum order
1 MW
Lead time
Start after material at site
Warranty
Defect liability 24 months
Standards
IS 732 (Electrical Wiring), IEC 62548, CEA (Measures relating to Safety) Regulations
Delivers to
All India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Installation scope50 MWMAH-723-01Installation scope: 50 MW1 MW · Start after material at siteon quote
Installation scope100 MWMAH-723-02Installation scope: 100 MW1 MW · Start after material at siteon quote
Installation scope200 MWMAH-723-03Installation scope: 200 MW1 MW · Start after material at siteon quote

Specifications

Installation scope50 MW to 200 MW (see variants)
ScopeStructure and module installation
Manpower deployedPeak crew of 200made to order: 25 technicians per MW-block / 60 technicians plus supervisors
SupervisionSite engineer and safety officer
EquipmentOwn cranes and erection toolsmade to order: Pile driver, crane, telehandler
Quality planISO 9001 QAP with hold points
SafetyLost-time-injury-free target, HIRAmade to order: Daily toolbox talks, PPE, permits
LicenceElectrical contractor licence
InsuranceCAR and workmen compensationmade to order: CAR, WC and third-party liability
ReportingDaily progress reportmade to order: Weekly report with look-ahead plan
Payment termsMonthly running bills