Catalogue / Reciprocating gas & dual-fuel engines
Biogas engine genset, Elite seriesSample
by Mahabaleshwarprakash Engine Power (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Mahabaleshwarprakash Engine Power (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Mahabaleshwarprakash Elite biogas engine genset, offered in 5 electrical output options from 2 MW to 18 MW. Key features: heat recovery for CHP, fast start and load pick-up and remote monitoring and diagnostics. Suited to peak power for industry, biogas projects and hospitals and malls. Designed and tested to ISO 8528, ISO 3046 and CPCB CPCB-IV+. Lead time 16-24 weeks; delivers to East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Mahabaleshwarprakash
- Model
- MAH-092 series
- Listing type
- Product
- Unit
- nos
- Minimum order
- 1 nos
- Lead time
- 16-24 weeks
- Warranty
- 24 months or 8000 running hours
- Standards
- ISO 8528, ISO 3046, CPCB CPCB-IV+
- Delivers to
- East & North-East India
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- Drum / reel with end caps
- Delivery terms
- FOR nearest railhead
- Returns
- Replacement of items damaged in transit within 7 days
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Electrical output2 MWMAH-092-01 | Electrical output: 2 MW | 1 nos · 16-24 weeks | on quote |
| Electrical output4.5 MWMAH-092-02 | Electrical output: 4.5 MW | 1 nos · 16-24 weeks | on quote |
| Electrical output9 MWMAH-092-03 | Electrical output: 9 MW | 1 nos · 16-24 weeks | on quote |
| Electrical output12 MWMAH-092-04 | Electrical output: 12 MW | 1 nos · 30-40 weeks | on quote |
| Electrical output18 MWMAH-092-05 | Electrical output: 18 MW | 1 nos · 30-40 weeks | on quote |
Specifications
| Electrical output | 2 MW to 18 MW (see variants) |
|---|---|
| Fuel | Biogas |
| Engine speed | 1500 rpm |
| Electrical efficiency | 44%made to order: 40% / 47% |
| Cylinders | V20 |
| Combustion | Lean-burn spark ignited |
| Cooling | Water-watermade to order: Radiator |
| Generator voltage | 11 kV |
| Emission | CPCB genset normsmade to order: NOx < 250 mg/Nm3 |
| Starting | Air |
| Enclosure | Container |
| Heat recovery | Hot water |