Catalogue / Grid connectivity & GNA applications
Stage-II connectivity and bank guarantee support, Neo seriesSample
by Mahanadi Consultants (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Mahanadi Consultants (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Stage-II connectivity and bank guarantee support from Mahanadi, Neo series: 5 capacity applied options between 50 MW and 1000 MW. Key features: bank guarantee timeline tracking, support for relinquishment and transfer and regular updates of queue status. Typically used for storage developers, renewable developers and industrial captive generators. Delivered in line with CERC (Connectivity and General Network Access) Regulations 2022, CEA (Technical Standards for Connectivity) Regulations and Indian Electricity Grid Code. Mobilisation Grant 3-9 months; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Mahanadi
- Model
- MAH-373 series
- Listing type
- Service
- Unit
- application
- Minimum order
- 1 application
- Lead time
- Grant 3-9 months
- Warranty
- As per contract
- Standards
- CERC (Connectivity and General Network Access) Regulations 2022, CEA (Technical Standards for Connectivity) Regulations, Indian Electricity Grid Code
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Capacity applied50 MWMAH-373-01 | Capacity applied: 50 MW | 1 application · Grant 3-9 months | on quote |
| Capacity applied100 MWMAH-373-02 | Capacity applied: 100 MW | 1 application · Grant 3-9 months | on quote |
| Capacity applied250 MWMAH-373-03 | Capacity applied: 250 MW | 1 application · Grant 3-9 months | on quote |
| Capacity applied500 MWMAH-373-04 | Capacity applied: 500 MW | 1 application · Grant 3-9 months | on quote |
| Capacity applied1000 MWMAH-373-05 | Capacity applied: 1000 MW | 1 application · Grant 3-9 months | on quote |
Specifications
| Capacity applied | 50 MW to 1000 MW (see variants) |
|---|---|
| Application | Bothmade to order: Connectivity / GNA |
| Scope | End-to-end liaison |
| Bank guarantee | Arranged through partner bank |
| Studies | Detailed power system study |
| Portal handling | STU portal |
| Team | Regulatory lead and engineermade to order: Dedicated manager |
| Timeline | Filing in 2 weeksmade to order: Approval 3-6 months |
| Technical documents | SLD, land proof, board resolution |
| Queries | Until grantmade to order: Responded within 2 days |
| Fee basis | Fixed |