Catalogue / Substation & line O&M
Power transformer routine checks, Ultra seriesSample
by Mahanadi Consultants (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Mahanadi Consultants (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Mahanadi Ultra power transformer routine checks, offered in 3 voltage level options from 33 kV to 132 kV. Highlights: insulator and joint inspection, licensed supervisory staff and fault analysis within 24 hours. Used by renewable pooling substations, state utility outsourcing and railway and metro sub-stations. Delivered in line with CEA (Measures relating to Safety) Regulations, CEA (Grid Standards) Regulations and IS 10028 (Transformer Installation). Mobilisation Mobilisation in 2-3 weeks; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Mahanadi
- Model
- MAH-057 series
- Listing type
- Service
- Unit
- month
- Minimum order
- 1 month
- Lead time
- Mobilisation in 2-3 weeks
- Warranty
- Service credits for avoidable outages
- Standards
- CEA (Measures relating to Safety) Regulations, CEA (Grid Standards) Regulations, IS 10028 (Transformer Installation)
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Voltage level33 kVMAH-057-01 | Voltage level: 33 kV | 1 month · Mobilisation in 2-3 weeks | on quote |
| Voltage level66 kVMAH-057-02 | Voltage level: 66 kV | 1 month · Mobilisation in 2-3 weeks | on quote |
| Voltage level132 kVMAH-057-03 | Voltage level: 132 kV | 1 month · Mobilisation in 2-3 weeks | on quote |
Specifications
| Voltage level | 33 kV to 132 kV (see variants) |
|---|---|
| Scope | Maintenance only |
| Shift pattern | 3 shifts, 24x7made to order: General shift plus on-call |
| Manpower | Two engineers plus 12 staffmade to order: Engineer plus 6 operators |
| Line patrolling | Quarterly drone patrol |
| Testing | Annual relay and CT/PT testmade to order: Thermography twice a year |
| Statutory records | Log books, permits, shutdown register |
| Spares | Critical spares by ownermade to order: Consumables included |
| Response time | 4 hoursmade to order: 2 hours for trip |
| Reporting | Real-time dashboardsmade to order: Monthly fault and maintenance report |
| Term | 1 year |