Catalogue / SCR / SNCR NOx control
Catalyst module, Elite seriesSample
by Mahanadi Environmental Systems (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Mahanadi Environmental Systems (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Mahanadi Elite catalyst module, offered in 6 flue gas flow options from 20000 Nm3/h to 1000000 Nm3/h. Highlights: static mixer for uniform gas mixing, CEMS linked reagent dosing and meets NOx limits for power plants. Typically used for industrial boilers, biomass boilers and coal-fired power units. Designed and tested to MoEF&CC notification 2015, CPCB norms and IS 11255 (Part 7). Lead time 30-44 weeks; delivers to All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Mahanadi
- Model
- MAH-739 series
- Listing type
- Product
- Unit
- set
- Minimum order
- 1 set
- Lead time
- 30-44 weeks
- Warranty
- 24000 operating hours on catalyst
- Standards
- MoEF&CC notification 2015, CPCB norms, IS 11255 (Part 7)
- Delivers to
- All India and export (SAARC, Middle East, Africa)
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- Corrugated box on pallet
- Delivery terms
- Ex-works, freight extra at actuals
- Returns
- No returns on made-to-order items
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Flue gas flow20000 Nm3/hMAH-739-01 | Flue gas flow: 20000 Nm3/h | 1 set · 30-44 weeks | for verified buyers |
| Flue gas flow50000 Nm3/hMAH-739-02 | Flue gas flow: 50000 Nm3/h | 1 set · 30-44 weeks | for verified buyers |
| Flue gas flow100000 Nm3/hMAH-739-03 | Flue gas flow: 100000 Nm3/h | 1 set · 30-44 weeks | for verified buyers |
| Flue gas flow250000 Nm3/hMAH-739-04 | Flue gas flow: 250000 Nm3/h | 1 set · 30-44 weeks | for verified buyers |
| Flue gas flow500000 Nm3/hMAH-739-05 | Flue gas flow: 500000 Nm3/h | 1 set · 30-44 weeks | for verified buyers |
| Flue gas flow1000000 Nm3/hMAH-739-06 | Flue gas flow: 1000000 Nm3/h | 1 set · 30-44 weeks | for verified buyers |
Specifications
| Flue gas flow | 20000 Nm3/h to 1000000 Nm3/h (see variants) |
|---|---|
| Technology | Hybrid |
| NOx removal efficiency | 85% |
| Reagent | Aqueous ammonia |
| Catalyst | Honeycomb V2O5-WO3/TiO2 |
| Operating temperature | 320-400 deg Cmade to order: 850-1050 deg C |
| Ammonia slip | Below 5 ppm |
| Injection grid | Multi-nozzle |
| Control | PLC interlocked with CEMS |
| Reagent storage | 50 cu m |
| Outlet NOx | Below 450 mg/Nm3made to order: Below 100 mg/Nm3 |