Catalogue / OHE masts, cantilevers & catenary

No photo yet

Steel structure for OHE, Eco seriesSample

by Mahanadifaraday Traction Systems (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Mahanadifaraday Traction Systems (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

Mahanadifaraday Eco steel structure for OHE, offered in 4 mast type options from Single track mast to Portal 4-track. Highlights: designed per RDSO drawings, matching cantilever sets and galvanised after fabrication. Used by port railways, dedicated freight corridors and railway electrification. Designed and tested to RDSO TI/SPC/OHE, IS 800 and IS 2062. Lead time 8-12 weeks; delivers to South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Mahanadifaraday
Model
MAH-1C3 series
Listing type
Product
Unit
nos
Minimum order
10 nos
Lead time
8-12 weeks
Warranty
12 months
Standards
RDSO TI/SPC/OHE, IS 800, IS 2062
Delivers to
South India
GST rate
18 %
Country of origin
India
Packaging
As per item, transit-safe
Delivery terms
FOR site, freight included
Returns
Replacement of items damaged in transit within 7 days
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Mast typeSingle track mastMAH-1C3-01Mast type: Single track mast10 nos · 8-12 weeksfor verified buyers
Mast typeDouble track mastMAH-1C3-02Mast type: Double track mast10 nos · 8-12 weeksfor verified buyers
Mast typePortal 2-trackMAH-1C3-03Mast type: Portal 2-track10 nos · 8-12 weeksfor verified buyers
Mast typePortal 4-trackMAH-1C3-04Mast type: Portal 4-track10 nos · 8-12 weeksfor verified buyers

Specifications

Mast typeSingle track mast to Portal 4-track (see variants)
SectionRolled beam
Height9.5 m
Steel gradeFe 410made to order: Fe 490
GalvanisingHot-dip 610 g/m2
Mast bending momentPer RDSO
FoundationPilemade to order: Concrete block
CantileverTubular, galvanised
Registration armIncluded
InsulatorPolymer or porcelain
Setting distance2.8 m
FittingsHot-dip galvanised
WeldingCertified welders

BARREL: Bharat Atom Renewable Resources Energy Limited