Catalogue / Traction SCADA

No photo yet

SCADA for 25 kV AC electrification, Prime seriesSample

by Mahanadifaraday Traction Systems (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Mahanadifaraday Traction Systems (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

Mahanadifaraday Prime SCADA for 25 kV AC electrification, offered in 5 control posts options from Up to 10 posts to Up to 250 posts. Design: impedance fault locator, failover in under 3 seconds and energy and tariff reports. Used by freight corridors, metro traction control and mining railways. Designed and tested to RDSO Spec, IEC 60870-5-104 and IEC 62443. Lead time 20-28 weeks; delivers to South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Mahanadifaraday
Model
MAH-C54 series
Listing type
Product
Unit
lot
Minimum order
5 lot
Lead time
20-28 weeks
Warranty
24 months
Standards
RDSO Spec, IEC 60870-5-104, IEC 62443
Delivers to
South India
GST rate
18 %
Country of origin
India
Packaging
As per item, transit-safe
Delivery terms
Door delivery in metro cities
Returns
No returns on made-to-order items
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Control postsUp to 10 postsMAH-C54-01Control posts: Up to 10 posts5 lot · 20-28 weeksfor verified buyers
Control postsUp to 25 postsMAH-C54-02Control posts: Up to 25 posts5 lot · 20-28 weeksfor verified buyers
Control postsUp to 50 postsMAH-C54-03Control posts: Up to 50 posts5 lot · 20-28 weeksfor verified buyers
Control postsUp to 100 postsMAH-C54-04Control posts: Up to 100 posts5 lot · 20-28 weeksfor verified buyers
Control postsUp to 250 postsMAH-C54-05Control posts: Up to 250 posts5 lot · 20-28 weeksfor verified buyers

Specifications

Control postsUp to 10 posts to Up to 250 posts (see variants)
ArchitectureRedundant server
RTU I/OPer post
CommunicationOFC / MPLSmade to order: GSM backup
ProtocolIEC 61850
HMIMulti-console video wall
Historian5 years
Time syncGPS
Cyber-securityIEC 62443
RedundancyHot standby
ReportsEnergy, faults, SOE
Fault locationImpedance based
InterlockingRemote with block

BARREL: Bharat Atom Renewable Resources Energy Limited