Catalogue / Electrical safety audits

No photo yet

Earthing and lightning protection audit, Volt seriesSample

by Mahanadi Logistics (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Mahanadi Logistics (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

Earthing and lightning protection audit from Mahanadi, Volt series: 3 installed load options between 10 MVA and 50 MVA. Design: photographic evidence of non-compliances, compliance matrix against CEA safety rules and training recommendations for staff. Suited to hospitals and commercial buildings, data centres and solar and wind sites. Delivered in line with Indian Electricity Act 2003, CEA (Measures relating to Safety) Regulations and IS 5216. Mobilisation Report in 7-14 days; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Mahanadi
Model
MAH-5F4 series
Listing type
Service
Unit
site
Minimum order
1 site
Lead time
Report in 7-14 days
Warranty
Re-audit at reduced rate
Standards
Indian Electricity Act 2003, CEA (Measures relating to Safety) Regulations, IS 5216
Delivers to
All India and export (SAARC, Middle East, Africa)
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Installed load10 MVAMAH-5F4-01Installed load: 10 MVA1 site · Report in 7-14 daysfor verified buyers
Installed load25 MVAMAH-5F4-02Installed load: 25 MVA1 site · Report in 7-14 daysfor verified buyers
Installed load50 MVAMAH-5F4-03Installed load: 50 MVA1 site · Report in 7-14 daysfor verified buyers

Specifications

Installed load10 MVA to 50 MVA (see variants)
ScopeAudit with arc-flash studymade to order: Visual and documentation audit / Audit with measurements
AuditorChartered engineermade to order: CEA-licensed engineer
MeasurementsEarth resistance, insulation
ReportFindings with risk ratingmade to order: Action plan with timeline
Statutory recordsPermit-to-work auditmade to order: Registers, test certificates, licence
Sampling100% of HV equipmentmade to order: Representative LV panels
Follow-upRe-audit after 3 months
Turnaround1-2 weeks
PresentationReport onlymade to order: Findings to management
AccreditationGovernment recognised agencymade to order: ISO/IEC 17020 body

BARREL: Bharat Atom Renewable Resources Energy Limited