Pre-commissioning tests for substations, Smart seriesSample

by Mahanadi Logistics (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Mahanadi Logistics (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

The Smart service of pre-commissioning tests for substations by Mahanadi covers 6 plant size options (5 MW to 250 MW). Design: final dossier for handover, instrument calibration certificates and checklist driven testing. Suited to lender completion, renewable parks and EPC handover. Delivered in line with IEC 62446-1, IS 3043 and IEC 61557. Mobilisation Mobilisation in 3-7 days; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Mahanadi
Model
MAH-1A5 series
Listing type
Service
Unit
site
Minimum order
1 site
Lead time
Mobilisation in 3-7 days
Warranty
Report accuracy guaranteed
Standards
IEC 62446-1, IS 3043, IEC 61557
Delivers to
All India and export (SAARC, Middle East, Africa)
GST rate
18 %
Country of origin
India (imported sub-assemblies)
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Plant size5 MWMAH-1A5-01Plant size: 5 MW1 site · Mobilisation in 3-7 dayson quote
Plant size10 MWMAH-1A5-02Plant size: 10 MW1 site · Mobilisation in 3-7 dayson quote
Plant size25 MWMAH-1A5-03Plant size: 25 MW1 site · Mobilisation in 3-7 dayson quote
Plant size50 MWMAH-1A5-04Plant size: 50 MW1 site · Mobilisation in 3-7 dayson quote
Plant size100 MWMAH-1A5-05Plant size: 100 MW1 site · On-site 3-21 dayson quote
Plant size250 MWMAH-1A5-06Plant size: 250 MW1 site · On-site 3-21 dayson quote

Specifications

Plant size5 MW to 250 MW (see variants)
ScopeSolar SATmade to order: Electrical pre-commissioning / Complete SAT with performance test
InstrumentsInsulation tester, earth tester
Test sequencePer client approved formatmade to order: Visual, mechanical, electrical
TeamTeam of 6 with lead
Duration on site3 weeks
ReportsDigital dossier with photosmade to order: Test results on approved formats
CalibrationCalibration certificates attachedmade to order: NABL traceable
Witnessed byLender engineer or authoritymade to order: Client engineer
Retest policyOne retest includedmade to order: Charged
PaymentOn completion of reportmade to order: 50% advance

BARREL: Bharat Atom Renewable Resources Energy Limited