Catalogue / Electrical safety audits
Earthing and lightning protection audit, Edge seriesSample
by Mahanadi Logistics (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Mahanadi Logistics (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Edge service of earthing and lightning protection audit by Mahanadi covers 5 installed load options (1 MVA to 50 MVA). Design: earthing health and soil resistivity, risk-ranked findings and training recommendations for staff. Suited to hospitals and commercial buildings, manufacturing plants and data centres. Delivered in line with Indian Electricity Act 2003, CEA (Measures relating to Safety) Regulations and IS 5216. Mobilisation Audit in 1-2 weeks; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Mahanadi
- Model
- MAH-5F7 series
- Listing type
- Service
- Unit
- site
- Minimum order
- 1 site
- Lead time
- Audit in 1-2 weeks
- Warranty
- Re-audit at reduced rate
- Standards
- Indian Electricity Act 2003, CEA (Measures relating to Safety) Regulations, IS 5216
- Delivers to
- All India and export (SAARC, Middle East, Africa)
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Installed load1 MVAMAH-5F7-01 | Installed load: 1 MVA | 1 site · Audit in 1-2 weeks | on quote |
| Installed load5 MVAMAH-5F7-02 | Installed load: 5 MVA | 1 site · Audit in 1-2 weeks | on quote |
| Installed load10 MVAMAH-5F7-03 | Installed load: 10 MVA | 1 site · Audit in 1-2 weeks | on quote |
| Installed load25 MVAMAH-5F7-04 | Installed load: 25 MVA | 1 site · Report in 7-14 days | on quote |
| Installed load50 MVAMAH-5F7-05 | Installed load: 50 MVA | 1 site · Report in 7-14 days | on quote |
Specifications
| Installed load | 1 MVA to 50 MVA (see variants) |
|---|---|
| Scope | Audit with measurements |
| Auditor | Chartered engineer |
| Measurements | Thermography and power quality |
| Report | Action plan with timeline |
| Statutory records | Permit-to-work auditmade to order: Registers, test certificates, licence |
| Sampling | Representative LV panels |
| Follow-up | Close-out verificationmade to order: Re-audit after 3 months |
| Turnaround | 1-2 weeks |
| Presentation | Report only |
| Accreditation | ISO/IEC 17020 body |