Catalogue / Third-party inspection (TPI)
Cable drum inspection and sampling, Plus seriesSample
by Mahanadi Logistics (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Mahanadi Logistics (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Mahanadi Plus cable drum inspection and sampling, offered in 4 inspection effort options from 1 man-day to 20 man-days. Key features: quick mobilisation across India, hold and witness points per QAP and photographic evidence of each inspection. Typically used for utilities and PSUs, lender quality assurance and government procurement. Delivered in line with ISO/IEC 17020, IS 2500 (Sampling Inspection) and IS 2026 (Power Transformers). Mobilisation Inspector assigned in 48 hours; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Mahanadi
- Model
- MAH-217 series
- Listing type
- Service
- Unit
- day
- Minimum order
- 1 day
- Lead time
- Inspector assigned in 48 hours
- Warranty
- As per contract
- Standards
- ISO/IEC 17020, IS 2500 (Sampling Inspection), IS 2026 (Power Transformers)
- Delivers to
- All India and export (SAARC, Middle East, Africa)
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Inspection effort1 man-dayMAH-217-01 | Inspection effort: 1 man-day | 1 day · Inspector assigned in 48 hours | on quote |
| Inspection effort5 man-daysMAH-217-02 | Inspection effort: 5 man-days | 1 day · Inspector assigned in 48 hours | on quote |
| Inspection effort10 man-daysMAH-217-03 | Inspection effort: 10 man-days | 1 day · Report in 24-48 hours | on quote |
| Inspection effort20 man-daysMAH-217-04 | Inspection effort: 20 man-days | 1 day · Report in 24-48 hours | on quote |
Specifications
| Inspection effort | 1 man-day to 20 man-days (see variants) |
|---|---|
| Equipment inspected | Transformers and reactors |
| Inspection stage | Final pre-dispatch |
| Standards used | Per client specification |
| Inspector qualification | Level II NDT certified |
| Accreditation | Empanelled inspection agencymade to order: ISO/IEC 17020 body |
| Report | Detailed report with photos in 48 hoursmade to order: Inspection release note |
| Coverage | Pan Indiamade to order: Domestic and export vendors |
| Sampling | AQL level II |
| Release note | Digital signature |
| Travel | At actuals |