Catalogue / Electrical safety audits
Safety audit for solar plants and substations, Volt seriesSample
by Mahanadiloha Consultants (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Mahanadiloha Consultants (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Mahanadiloha Volt safety audit for solar plants and substations, offered in 4 installed load options from 1 MVA to 25 MVA. Key features: earthing health and soil resistivity, photographic evidence of non-compliances and risk-ranked findings. Used by hospitals and commercial buildings, manufacturing plants and data centres. Delivered in line with Indian Electricity Act 2003, CEA (Measures relating to Safety) Regulations and IS 5216. Mobilisation Audit in 1-2 weeks; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Mahanadiloha
- Model
- MAH-881 series
- Listing type
- Service
- Unit
- site
- Minimum order
- 1 site
- Lead time
- Audit in 1-2 weeks
- Warranty
- Re-audit at reduced rate
- Standards
- Indian Electricity Act 2003, CEA (Measures relating to Safety) Regulations, IS 5216
- Delivers to
- All India and export (SAARC, Middle East, Africa)
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Installed load1 MVAMAH-881-01 | Installed load: 1 MVA | 1 site · Audit in 1-2 weeks | for verified buyers |
| Installed load5 MVAMAH-881-02 | Installed load: 5 MVA | 1 site · Audit in 1-2 weeks | for verified buyers |
| Installed load10 MVAMAH-881-03 | Installed load: 10 MVA | 1 site · Report in 7-14 days | for verified buyers |
| Installed load25 MVAMAH-881-04 | Installed load: 25 MVA | 1 site · Report in 7-14 days | for verified buyers |
Specifications
| Installed load | 1 MVA to 25 MVA (see variants) |
|---|---|
| Scope | Audit with arc-flash studymade to order: Visual and documentation audit / Audit with measurements |
| Auditor | Chartered engineer |
| Measurements | Earth resistance, insulationmade to order: Thermography and power quality |
| Report | Findings with risk ratingmade to order: Action plan with timeline |
| Statutory records | Registers, test certificates, licence |
| Sampling | 100% of HV equipmentmade to order: Representative LV panels |
| Follow-up | Re-audit after 3 months |
| Turnaround | 3-4 weeks |
| Presentation | Report onlymade to order: Findings to management |
| Accreditation | ISO/IEC 17020 bodymade to order: Government recognised agency |