Catalogue / Third-party inspection (TPI)
Third-party inspection of electrical equipment at vendor works, Smart seriesSample
by Mahanadiloha Consultants (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Mahanadiloha Consultants (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Mahanadiloha Smart third-party inspection of electrical equipment at vendor works, offered in 3 inspection effort options from 1 man-day to 10 man-days. Key features: calibration check of test equipment, quick mobilisation across India and photographic evidence of each inspection. Typically used for government procurement, lender quality assurance and utilities and PSUs. Delivered in line with ISO/IEC 17020, IS 2500 (Sampling Inspection) and IS 2026 (Power Transformers). Mobilisation Inspector assigned in 48 hours; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Mahanadiloha
- Model
- MAH-6E5 series
- Listing type
- Service
- Unit
- day
- Minimum order
- 1 day
- Lead time
- Inspector assigned in 48 hours
- Warranty
- Re-inspection at no cost for disputed lots
- Standards
- ISO/IEC 17020, IS 2500 (Sampling Inspection), IS 2026 (Power Transformers)
- Delivers to
- All India and export (SAARC, Middle East, Africa)
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Inspection effort1 man-dayMAH-6E5-01 | Inspection effort: 1 man-day | 1 day · Inspector assigned in 48 hours | for verified buyers |
| Inspection effort5 man-daysMAH-6E5-02 | Inspection effort: 5 man-days | 1 day · Inspector assigned in 48 hours | for verified buyers |
| Inspection effort10 man-daysMAH-6E5-03 | Inspection effort: 10 man-days | 1 day · Inspector assigned in 48 hours | for verified buyers |
Specifications
| Inspection effort | 1 man-day to 10 man-days (see variants) |
|---|---|
| Equipment inspected | Switchgear and relaysmade to order: Transformers and reactors / PV modules and inverters / Cables and conductors |
| Inspection stage | In-process |
| Standards used | Per approved QAP |
| Inspector qualification | B.E. Electrical with 8 years experiencemade to order: Level II NDT certified |
| Accreditation | ISO/IEC 17020 bodymade to order: Empanelled inspection agency |
| Report | Inspection release notemade to order: Detailed report with photos in 48 hours |
| Coverage | Domestic and export vendorsmade to order: Pan India |
| Sampling | As per IS 2500 |
| Release note | Hard copy plus scan |
| Travel | At actualsmade to order: Included in rate |