Catalogue / Site acceptance & pre-commissioning tests

No photo yet

Cable and insulation resistance testing, Smart 8 seriesSample

by Mahanadiloha Consultants (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Mahanadiloha Consultants (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Cable and insulation resistance testing from Mahanadiloha, Smart 8 series: 4 plant size options between 5 MW and 50 MW. Highlights: defect register shared daily, checklist driven testing and support to CEIG inspection. Typically used for renewable parks, lender completion and industrial substations. Delivered in line with IEC 62446-1, IS 3043 and IEC 61557. Mobilisation On-site 3-21 days; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Mahanadiloha
Model
MAH-C65 series
Listing type
Service
Unit
site
Minimum order
1 site
Lead time
On-site 3-21 days
Warranty
Report accuracy guaranteed
Standards
IEC 62446-1, IS 3043, IEC 61557
Delivers to
All India and export (SAARC, Middle East, Africa)
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Plant size5 MWMAH-C65-01Plant size: 5 MW1 site · On-site 3-21 dayson quote
Plant size10 MWMAH-C65-02Plant size: 10 MW1 site · On-site 3-21 dayson quote
Plant size25 MWMAH-C65-03Plant size: 25 MW1 site · On-site 3-21 dayson quote
Plant size50 MWMAH-C65-04Plant size: 50 MW1 site · On-site 3-21 dayson quote

Specifications

Plant size5 MW to 50 MW (see variants)
ScopeSolar SATmade to order: Electrical pre-commissioning / Complete SAT with performance test
InstrumentsInsulation tester, earth testermade to order: Relay test set, IV tracer, CRM
Test sequencePer client approved formatmade to order: Visual, mechanical, electrical
TeamTest engineer plus 2 technicians
Duration on site10 daysmade to order: 3-5 days / 3 weeks
ReportsTest results on approved formatsmade to order: Digital dossier with photos
CalibrationCalibration certificates attachedmade to order: NABL traceable
Witnessed byClient engineer
Retest policyChargedmade to order: One retest included
PaymentOn completion of report

BARREL: Bharat Atom Renewable Resources Energy Limited