Catalogue / Electrical safety audits
Safety audit for solar plants and substations, Core seriesSample
by Mahanadiloha Consultants (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Mahanadiloha Consultants (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Safety audit for solar plants and substations from Mahanadiloha, Core series: 5 installed load options between 1 MVA and 50 MVA. Key features: training recommendations for staff, photographic evidence of non-compliances and fire exit and detection checks. Typically used for manufacturing plants, solar and wind sites and data centres. Delivered in line with Indian Electricity Act 2003, CEA (Measures relating to Safety) Regulations and IS 5216. Mobilisation Report in 7-14 days; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Mahanadiloha
- Model
- MAH-889 series
- Listing type
- Service
- Unit
- site
- Minimum order
- 1 site
- Lead time
- Report in 7-14 days
- Warranty
- Clarifications on report at no cost for 6 months
- Standards
- Indian Electricity Act 2003, CEA (Measures relating to Safety) Regulations, IS 5216
- Delivers to
- All India and export (SAARC, Middle East, Africa)
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Installed load1 MVAMAH-889-01 | Installed load: 1 MVA | 1 site · Report in 7-14 days | on quote |
| Installed load5 MVAMAH-889-02 | Installed load: 5 MVA | 1 site · Report in 7-14 days | on quote |
| Installed load10 MVAMAH-889-03 | Installed load: 10 MVA | 1 site · Report in 7-14 days | on quote |
| Installed load25 MVAMAH-889-04 | Installed load: 25 MVA | 1 site · Report in 7-14 days | on quote |
| Installed load50 MVAMAH-889-05 | Installed load: 50 MVA | 1 site · Report in 7-14 days | on quote |
Specifications
| Installed load | 1 MVA to 50 MVA (see variants) |
|---|---|
| Scope | Audit with measurements |
| Auditor | CEA-licensed engineermade to order: Chartered engineer |
| Measurements | Earth resistance, insulationmade to order: Thermography and power quality |
| Report | Findings with risk rating |
| Statutory records | Registers, test certificates, licence |
| Sampling | 100% of HV equipment |
| Follow-up | Re-audit after 3 months |
| Turnaround | 1-2 weeksmade to order: 3-4 weeks |
| Presentation | Report onlymade to order: Findings to management |
| Accreditation | Government recognised agency |