Catalogue / Third-party inspection (TPI)
Third-party inspection of electrical equipment at vendor works, Xtra seriesSample
by Mahanadiloha Consultants (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Mahanadiloha Consultants (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Mahanadiloha Xtra third-party inspection of electrical equipment at vendor works, offered in 5 inspection effort options from 5 man-days to 100 man-days. Key features: calibration check of test equipment, independent opinion for buyers and hold and witness points per QAP. Used by utilities and PSUs, EPC contractors and developers and government procurement. Delivered in line with ISO/IEC 17020, IS 2500 (Sampling Inspection) and IS 2026 (Power Transformers). Mobilisation Report in 24-48 hours; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Mahanadiloha
- Model
- MAH-6E1 series
- Listing type
- Service
- Unit
- day
- Minimum order
- 1 day
- Lead time
- Report in 24-48 hours
- Warranty
- As per contract
- Standards
- ISO/IEC 17020, IS 2500 (Sampling Inspection), IS 2026 (Power Transformers)
- Delivers to
- All India and export (SAARC, Middle East, Africa)
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Inspection effort5 man-daysMAH-6E1-01 | Inspection effort: 5 man-days | 1 day · Report in 24-48 hours | for verified buyers |
| Inspection effort10 man-daysMAH-6E1-02 | Inspection effort: 10 man-days | 1 day · Report in 24-48 hours | for verified buyers |
| Inspection effort20 man-daysMAH-6E1-03 | Inspection effort: 20 man-days | 1 day · Report in 24-48 hours | for verified buyers |
| Inspection effort50 man-daysMAH-6E1-04 | Inspection effort: 50 man-days | 1 day · Report in 24-48 hours | for verified buyers |
| Inspection effort100 man-daysMAH-6E1-05 | Inspection effort: 100 man-days | 1 day · Report in 24-48 hours | for verified buyers |
Specifications
| Inspection effort | 5 man-days to 100 man-days (see variants) |
|---|---|
| Equipment inspected | Switchgear and relaysmade to order: Transformers and reactors / PV modules and inverters / Cables and conductors |
| Inspection stage | In-processmade to order: Raw material / Final pre-dispatch |
| Standards used | Per client specificationmade to order: Per approved QAP |
| Inspector qualification | Level II NDT certified |
| Accreditation | Empanelled inspection agency |
| Report | Inspection release notemade to order: Detailed report with photos in 48 hours |
| Coverage | Domestic and export vendorsmade to order: Pan India |
| Sampling | AQL level II |
| Release note | Digital signature |
| Travel | Included in ratemade to order: At actuals |