Catalogue / Cabling, trenching & HDD works
Horizontal directional drilling for road and rail crossings, Max seriesSample
by Mahanadiparam Technical Services (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Mahanadiparam Technical Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Mahanadiparam Max horizontal directional drilling for road and rail crossings, offered in 3 cable route length options from 5 km to 20 km. Key features: warning tape and marker installation, utility locating before excavation and drum handling and pulling tension control. Suited to renewable plant internal networks, industrial plant cabling and railway and highway crossings. Delivered in line with IS 1255 (Cable Installation), IS 7098 (XLPE Cables) and IEC 60840. Mobilisation Mobilisation in 7 days; serves West India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Mahanadiparam
- Model
- MAH-C81 series
- Listing type
- Service
- Unit
- km
- Minimum order
- 1 km
- Lead time
- Mobilisation in 7 days
- Warranty
- Restoration warranty 6 months
- Standards
- IS 1255 (Cable Installation), IS 7098 (XLPE Cables), IEC 60840
- Delivers to
- West India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Cable route length5 kmMAH-C81-01 | Cable route length: 5 km | 1 km · Mobilisation in 7 days | for verified buyers |
| Cable route length10 kmMAH-C81-02 | Cable route length: 10 km | 1 km · Mobilisation in 7 days | for verified buyers |
| Cable route length20 kmMAH-C81-03 | Cable route length: 20 km | 1 km · Mobilisation in 7 days | for verified buyers |
Specifications
| Cable route length | 5 km to 20 km (see variants) |
|---|---|
| Method | Trenchless HDD |
| HDD capacity | Up to 250 mm bore |
| Trench depth | 1.5 mmade to order: 0.9 m / 1.2 m |
| Cable type | LT armouredmade to order: 11/33 kV XLPE |
| Jointing | Heat shrinkmade to order: Cold shrink / Premoulded |
| Restoration | Road and footpath restorationmade to order: Backfill and compaction only |
| Permissions | Contractor arranges road cut approvals |
| Testing | Hipot and sheath test |
| Productivity | 50 m per day HDD |
| Crew | HDD crew of 8 with rig |