Catalogue / Solar plant O&M & module cleaning
Vegetation management and soiling control, Elite seriesSample
by Mahanadiparam Technical Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Mahanadiparam Technical Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Elite service of vegetation management and soiling control by Mahanadiparam covers 4 plant capacity options (10 MWp to 100 MWp). Highlights: compliance with grid code scheduling, inventory and spares ledger and daily generation and loss analysis. Typically used for group captive plants, c&I rooftop owners and lender-monitored assets. Delivered in line with IEC 61724-1, IEC 62446-1 and CEA (Technical Standards for Connectivity) Regulations. Mobilisation Takeover in 2-3 weeks; serves West India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Mahanadiparam
- Model
- MAH-F18 series
- Listing type
- Service
- Unit
- MWp
- Minimum order
- 1 MWp
- Lead time
- Takeover in 2-3 weeks
- Warranty
- Service credits as per contract
- Standards
- IEC 61724-1, IEC 62446-1, CEA (Technical Standards for Connectivity) Regulations
- Delivers to
- West India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Plant capacity10 MWpMAH-F18-01 | Plant capacity: 10 MWp | 1 MWp · Takeover in 2-3 weeks | on quote |
| Plant capacity25 MWpMAH-F18-02 | Plant capacity: 25 MWp | 1 MWp · Takeover in 2-3 weeks | on quote |
| Plant capacity50 MWpMAH-F18-03 | Plant capacity: 50 MWp | 1 MWp · Baseline audit before takeover | on quote |
| Plant capacity100 MWpMAH-F18-04 | Plant capacity: 100 MWp | 1 MWp · Baseline audit before takeover | on quote |
Specifications
| Plant capacity | 10 MWp to 100 MWp (see variants) |
|---|---|
| Scope | Cleaning and routine checks |
| Cleaning method | Roboticmade to order: Semi-automatic wet / Waterless dry brush |
| Cleaning frequency | Fortnightly |
| Availability guarantee | Plant availability 99%made to order: Grid availability 99.5% |
| Manpower | 1 engineer plus 4 technicians per 10 MWmade to order: Plant manager plus 15 staff for 100 MW |
| Spares | Client suppliesmade to order: Consumables included |
| Monitoring | Weekly PR and PLF reportmade to order: 24x7 remote SCADA |
| Response time | 4 hours for critical faults |
| Reporting | Dashboard access for lenders |
| Contract term | 5 years |