Catalogue / Installation & erection
Power transformer installation and oil filling, Flex seriesSample
by Mahanadiparam Technical Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Mahanadiparam Technical Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Power transformer installation and oil filling from Mahanadiparam, Flex series: 3 installation scope options between 1 MW and 10 MW. Key features: module handling to avoid micro-cracks, punch list closure before testing and cable route marking and tray fixing. Used by utility solar parks, c&I rooftop and ground mount and hybrid projects. Delivered in line with IS 732 (Electrical Wiring), IEC 62548 and CEA (Measures relating to Safety) Regulations. Mobilisation Start after material at site; serves West India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Mahanadiparam
- Model
- MAH-717 series
- Listing type
- Service
- Unit
- MW
- Minimum order
- 1 MW
- Lead time
- Start after material at site
- Warranty
- Defect liability 24 months
- Standards
- IS 732 (Electrical Wiring), IEC 62548, CEA (Measures relating to Safety) Regulations
- Delivers to
- West India
- GST rate
- 18 %
- Country of origin
- India (imported sub-assemblies)
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Installation scope1 MWMAH-717-01 | Installation scope: 1 MW | 1 MW · Start after material at site | on quote |
| Installation scope5 MWMAH-717-02 | Installation scope: 5 MW | 1 MW · Start after material at site | on quote |
| Installation scope10 MWMAH-717-03 | Installation scope: 10 MW | 1 MW · Start after material at site | on quote |
Specifications
| Installation scope | 1 MW to 10 MW (see variants) |
|---|---|
| Scope | Electrical BoP erectionmade to order: Structure and module installation / Complete mechanical and electrical erection |
| Manpower deployed | 60 technicians plus supervisorsmade to order: 25 technicians per MW-block / Peak crew of 200 |
| Supervision | Project manager, engineers, QA/QCmade to order: Site engineer and safety officer |
| Equipment | Pile driver, crane, telehandlermade to order: Own cranes and erection tools |
| Quality plan | ISO 9001 QAP with hold pointsmade to order: Client-approved ITP |
| Safety | Daily toolbox talks, PPE, permits |
| Licence | Class A contractor registration |
| Insurance | CAR and workmen compensation |
| Reporting | Weekly report with look-ahead planmade to order: Daily progress report |
| Payment terms | Milestone based with 10% retention |