Catalogue / Civil & foundation works

No photo yet

Wind turbine foundation construction, Duo 4 seriesSample

by Mahanadiparam Technical Services (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Mahanadiparam Technical Services (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Wind turbine foundation construction from Mahanadiparam, Duo 4 series: 4 works volume options between 10 MW equivalent and 100 MW equivalent. Key features: local labour employed where possible, cube and pile test records and waterproofing for cable trenches. Suited to wind farms, solar parks and industrial plants. Delivered in line with IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations) and IS 1893 (Seismic Design). Mobilisation Mobilisation in 10 days; serves West India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Mahanadiparam
Model
MAH-257 series
Listing type
Service
Unit
job
Minimum order
1 job
Lead time
Mobilisation in 10 days
Warranty
Pile load test certified
Standards
IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations), IS 1893 (Seismic Design)
Delivers to
West India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Works volume10 MW equivalentMAH-257-01Works volume: 10 MW equivalent1 job · Mobilisation in 10 dayson quote
Works volume25 MW equivalentMAH-257-02Works volume: 25 MW equivalent1 job · Mobilisation in 10 dayson quote
Works volume50 MW equivalentMAH-257-03Works volume: 50 MW equivalent1 job · 4-12 weeks executionon quote
Works volume100 MW equivalentMAH-257-04Works volume: 100 MW equivalent1 job · 4-12 weeks executionon quote

Specifications

Works volume10 MW equivalent to 100 MW equivalent (see variants)
Foundation typeRCC bored pile
Concrete gradeM30made to order: M25 / M40 for turbine foundation
Pull-out testingRandom test plus lateral loadmade to order: 2% piles tested
ReinforcementFe 550Dmade to order: Fe 500D TMT
Roads and drainageNot included
BoundaryChain link fence 2.4 m
QualityCube test reports per pourmade to order: NABL lab testing of materials
MachineryBatching plant at site
Duration4-8 weeks
Payment termsItem rate with retention

BARREL: Bharat Atom Renewable Resources Energy Limited