Catalogue / Civil & foundation works
Wind turbine foundation construction, Duo 4 seriesSample
by Mahanadiparam Technical Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Mahanadiparam Technical Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Wind turbine foundation construction from Mahanadiparam, Duo 4 series: 4 works volume options between 10 MW equivalent and 100 MW equivalent. Key features: local labour employed where possible, cube and pile test records and waterproofing for cable trenches. Suited to wind farms, solar parks and industrial plants. Delivered in line with IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations) and IS 1893 (Seismic Design). Mobilisation Mobilisation in 10 days; serves West India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Mahanadiparam
- Model
- MAH-257 series
- Listing type
- Service
- Unit
- job
- Minimum order
- 1 job
- Lead time
- Mobilisation in 10 days
- Warranty
- Pile load test certified
- Standards
- IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations), IS 1893 (Seismic Design)
- Delivers to
- West India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Works volume10 MW equivalentMAH-257-01 | Works volume: 10 MW equivalent | 1 job · Mobilisation in 10 days | on quote |
| Works volume25 MW equivalentMAH-257-02 | Works volume: 25 MW equivalent | 1 job · Mobilisation in 10 days | on quote |
| Works volume50 MW equivalentMAH-257-03 | Works volume: 50 MW equivalent | 1 job · 4-12 weeks execution | on quote |
| Works volume100 MW equivalentMAH-257-04 | Works volume: 100 MW equivalent | 1 job · 4-12 weeks execution | on quote |
Specifications
| Works volume | 10 MW equivalent to 100 MW equivalent (see variants) |
|---|---|
| Foundation type | RCC bored pile |
| Concrete grade | M30made to order: M25 / M40 for turbine foundation |
| Pull-out testing | Random test plus lateral loadmade to order: 2% piles tested |
| Reinforcement | Fe 550Dmade to order: Fe 500D TMT |
| Roads and drainage | Not included |
| Boundary | Chain link fence 2.4 m |
| Quality | Cube test reports per pourmade to order: NABL lab testing of materials |
| Machinery | Batching plant at site |
| Duration | 4-8 weeks |
| Payment terms | Item rate with retention |