SCADA for 25 kV AC electrification, Edge 3 seriesSample
by Mahanadi Rail Electrification (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Mahanadi Rail Electrification (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Edge 3 range of SCADA for 25 kV AC electrification by Mahanadi covers 5 control posts options (Up to 10 posts to Up to 250 posts). Key features: impedance fault locator, sequence of events recording and integration with OHE maintenance. Typically used for mining railways, metro traction control and railway zones. Designed and tested to RDSO Spec, IEC 60870-5-104 and IEC 62443. Lead time 20-28 weeks; delivers to North India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Mahanadi
- Model
- MAH-C51 series
- Listing type
- Product
- Unit
- lot
- Minimum order
- 2 lot
- Lead time
- 20-28 weeks
- Warranty
- 24 months
- Standards
- RDSO Spec, IEC 60870-5-104, IEC 62443
- Delivers to
- North India
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- Wooden crate, seaworthy
- Delivery terms
- FOR nearest railhead
- Returns
- No returns on made-to-order items
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Control postsUp to 10 postsMAH-C51-01 | Control posts: Up to 10 posts | 2 lot · 20-28 weeks | on quote |
| Control postsUp to 25 postsMAH-C51-02 | Control posts: Up to 25 posts | 2 lot · 20-28 weeks | on quote |
| Control postsUp to 50 postsMAH-C51-03 | Control posts: Up to 50 posts | 2 lot · 20-28 weeks | on quote |
| Control postsUp to 100 postsMAH-C51-04 | Control posts: Up to 100 posts | 2 lot · 20-28 weeks | on quote |
| Control postsUp to 250 postsMAH-C51-05 | Control posts: Up to 250 posts | 2 lot · 20-28 weeks | on quote |
Specifications
| Control posts | Up to 10 posts to Up to 250 posts (see variants) |
|---|---|
| Architecture | Distributed |
| RTU I/O | Per post |
| Communication | GSM backup |
| Protocol | IEC 61850made to order: IEC 60870-5-104 |
| HMI | Multi-console video wall |
| Historian | 5 years |
| Time sync | GPS |
| Cyber-security | IEC 62443 |
| Redundancy | Hot standby |
| Reports | Energy, faults, SOE |
| Fault location | Impedance based |
| Interlocking | Remote with block |