Remote terminal unit for TSS, Max 4 seriesSample
by Mahanadi Rail Electrification (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Mahanadi Rail Electrification (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Remote terminal unit for TSS from Mahanadi, Max 4 series: 3 control posts options between Up to 50 posts and Up to 250 posts. Highlights: failover in under 3 seconds, integration with OHE maintenance and remote operation of interrupters and isolators. Used by industrial rail, railway zones and mining railways. Designed and tested to RDSO Spec, IEC 60870-5-104 and IEC 62443. Lead time 12-16 weeks; delivers to North India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Mahanadi
- Model
- MAH-273 series
- Listing type
- Product
- Unit
- lot
- Minimum order
- 1 lot
- Lead time
- 12-16 weeks
- Warranty
- 24 months
- Standards
- RDSO Spec, IEC 60870-5-104, IEC 62443
- Delivers to
- North India
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- Steel skid with shrink wrap
- Delivery terms
- FOR site, freight included
- Returns
- Replacement of items damaged in transit within 7 days
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Control postsUp to 50 postsMAH-273-01 | Control posts: Up to 50 posts | 1 lot · 12-16 weeks | for verified buyers |
| Control postsUp to 100 postsMAH-273-02 | Control posts: Up to 100 posts | 1 lot · 12-16 weeks | for verified buyers |
| Control postsUp to 250 postsMAH-273-03 | Control posts: Up to 250 posts | 1 lot · 12-16 weeks | for verified buyers |
Specifications
| Control posts | Up to 50 posts to Up to 250 posts (see variants) |
|---|---|
| Architecture | Distributed |
| RTU I/O | Per post |
| Communication | GSM backupmade to order: OFC / MPLS |
| Protocol | IEC 61850 |
| HMI | Multi-console video wall |
| Historian | 5 years |
| Time sync | GPS |
| Cyber-security | IEC 62443 |
| Redundancy | Hot standby |
| Reports | Energy, faults, SOE |
| Fault location | Impedance based |
| Interlocking | Remote with block |