Catalogue / Equipotential bonding
Main earth terminal bar, Elite 4 seriesSample
by Malabar Lightning Protection (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Malabar Lightning Protection (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Malabar Elite 4 main earth terminal bar, offered in 5 capacity options from 12-way bar to Solar bonding kit 1 MWp. Design: bimetallic clamps prevent galvanic corrosion, low-resistance bonded connections between metal parts and labelled terminals for identification. Typically used for control room main earth terminal, data centre equipotential planes and solar module structure bonding. Designed and tested to IS 3043, IEC 60364-5-54 and IEC 62561-1. Lead time 3-4 weeks; delivers to West India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Malabar
- Model
- MAL-CB6 series
- Listing type
- Product
- Unit
- set
- Minimum order
- 2 set
- Lead time
- 3-4 weeks
- Warranty
- 24 months from supply
- Standards
- IS 3043, IEC 60364-5-54, IEC 62561-1
- Delivers to
- West India
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- Steel skid with shrink wrap
- Delivery terms
- FOR site, freight included
- Returns
- Replacement of items damaged in transit within 7 days
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Capacity12-way barMAL-CB6-01 | Capacity: 12-way bar | 2 set · 3-4 weeks | for verified buyers |
| Capacity24-way barMAL-CB6-02 | Capacity: 24-way bar | 2 set · 3-4 weeks | for verified buyers |
| CapacityJumper 16 mm² x 300 mmMAL-CB6-03 | Capacity: Jumper 16 mm² x 300 mm | 2 set · 3-4 weeks | for verified buyers |
| CapacityJumper 35 mm² x 500 mmMAL-CB6-04 | Capacity: Jumper 35 mm² x 500 mm | 2 set · 3-4 weeks | for verified buyers |
| CapacitySolar bonding kit 1 MWpMAL-CB6-05 | Capacity: Solar bonding kit 1 MWp | 2 set · 3-4 weeks | for verified buyers |
Specifications
| Capacity | 12-way bar to Solar bonding kit 1 MWp (see variants) |
|---|---|
| Bar material | Electrolytic copper |
| Bar size | 50x6 mm |
| Terminals | M8 studsmade to order: M10 studs |
| Insulators | Porcelainmade to order: SMC |
| Jumper conductor | Flexible tinned copper |
| Lug type | Crimp type tinned copper |
| Clamp | GI saddle |
| Voltage class | Earth conductor 1 kV insulated |
| Corrosion | Salt-spray tested 500 h |
| Rating | Fault current 25 kA, 1 s |
| Enclosure | Wall-mount box IP54made to order: Open bar |