Catalogue / Substation automation (IEC 61850)
Station SCADA with redundant servers, Eco seriesSample
by Malabarsurya Power Controls (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Malabarsurya Power Controls (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Station SCADA with redundant servers from Malabarsurya, Eco series: 3 bays options between Up to 8 bays and Up to 32 bays. Highlights: cyber-secure remote access, interoperable multi-vendor bay devices and sequence of events recorder. Typically used for transmission substations, metro traction and industrial plants. Designed and tested to IEC 61850, IEC 62351 and IEC 60870-5-104. Lead time 16-24 weeks; delivers to North India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Malabarsurya
- Model
- MAL-357 series
- Listing type
- Product
- Unit
- lot
- Minimum order
- 1 lot
- Lead time
- 16-24 weeks
- Warranty
- 36 months
- Standards
- IEC 61850, IEC 62351, IEC 60870-5-104
- Delivers to
- North India
- GST rate
- 18 %
- Country of origin
- India (imported sub-assemblies)
- Packaging
- Corrugated box on pallet
- Delivery terms
- Ex-works, freight extra at actuals
- Returns
- Returns within 15 days if unused, in original packing
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| BaysUp to 8 baysMAL-357-01 | Bays: Up to 8 bays | 1 lot · 16-24 weeks | for verified buyers |
| BaysUp to 16 baysMAL-357-02 | Bays: Up to 16 bays | 1 lot · 16-24 weeks | for verified buyers |
| BaysUp to 32 baysMAL-357-03 | Bays: Up to 32 bays | 1 lot · 16-24 weeks | for verified buyers |
Specifications
| Bays | Up to 8 bays to Up to 32 bays (see variants) |
|---|---|
| Architecture | Station busmade to order: Station + process bus |
| Protocol | IEC 60870-5-104made to order: IEC 61850 Ed 2 / DNP3 |
| Network topology | PRPmade to order: Dual star / HSR ring |
| HMI | Single HMI |
| Time sync | GPS with PTP |
| Gateway | Redundant to RLDC / SLDC |
| Cyber-security | Firewall, IEC 62351, NERC style |
| Historian | Included, 5 years data |
| Engineering tool | Configuration software |
| Network switches | Industrial managed |
| Auxiliary supply | 220 V DC |
| Testing | FAT + SAT |