Aggregation of industrial loads, Core seriesSample
by Malwa Advisory (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Malwa Advisory (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Aggregation of industrial loads from Malwa, Core series: 5 curtailable load options between 0.5 MW and 25 MW. Design: support for grid operators, revenue for flexible loads and reduced peak demand charges. Used by DISCOMs needing peak relief, industrial plants with flexible load and commercial buildings. Delivered in line with CERC DR Guidelines, State TOD Tariff Orders and OpenADR 2.0b. Mobilisation Assessment in 2-3 weeks; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Malwa
- Model
- MAL-B42 series
- Listing type
- Service
- Unit
- MW
- Minimum order
- 1 MW
- Lead time
- Assessment in 2-3 weeks
- Warranty
- As per programme terms
- Standards
- CERC DR Guidelines, State TOD Tariff Orders, OpenADR 2.0b
- Delivers to
- All India and export (SAARC, Middle East, Africa)
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Curtailable load0.5 MWMAL-B42-01 | Curtailable load: 0.5 MW | 1 MW · Assessment in 2-3 weeks | for verified buyers |
| Curtailable load1 MWMAL-B42-02 | Curtailable load: 1 MW | 1 MW · Assessment in 2-3 weeks | for verified buyers |
| Curtailable load5 MWMAL-B42-03 | Curtailable load: 5 MW | 1 MW · Assessment in 2-3 weeks | for verified buyers |
| Curtailable load10 MWMAL-B42-04 | Curtailable load: 10 MW | 1 MW · Enrolment 4-8 weeks | for verified buyers |
| Curtailable load25 MWMAL-B42-05 | Curtailable load: 25 MW | 1 MW · Enrolment 4-8 weeks | for verified buyers |
Specifications
| Curtailable load | 0.5 MW to 25 MW (see variants) |
|---|---|
| Programme | Aggregator DR |
| Control | Automated through SCADAmade to order: Manual |
| Notice | 2 hoursmade to order: Day ahead / 15 minutes |
| Duration per event | 1 hourmade to order: 4 hours |
| Events per year | Unlimited |
| Metering | Existing metermade to order: Dedicated interval meter |
| Incentive sharing | 80:20 |
| Baseline method | 10-day averagemade to order: Regression |
| Reporting | Monthly savings |
| Contract term | 3 yearsmade to order: 1 year |