Thermal and utility energy audit, Ultra seriesSample
by Malwa Advisory (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Malwa Advisory (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
The Ultra service of thermal and utility energy audit by Malwa covers 5 connected load options (100 kW to 10 MW). Key features: verification after implementation, payback and ROI ranking and statutory forms and BEE reporting. Suited to PAT designated consumers, hospitals and hotels and industrial plants. Delivered in line with Energy Conservation Act 2001, BEE Energy Auditor Regulations and IS 14160. Mobilisation Report in 2-4 weeks; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Malwa
- Model
- MAL-395 series
- Listing type
- Service
- Unit
- site
- Minimum order
- 1 site
- Lead time
- Report in 2-4 weeks
- Warranty
- Savings estimate accuracy within agreed band
- Standards
- Energy Conservation Act 2001, BEE Energy Auditor Regulations, IS 14160
- Delivers to
- All India and export (SAARC, Middle East, Africa)
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Connected load100 kWMAL-395-01 | Connected load: 100 kW | 1 site · Report in 2-4 weeks | for verified buyers |
| Connected load500 kWMAL-395-02 | Connected load: 500 kW | 1 site · Report in 2-4 weeks | for verified buyers |
| Connected load1 MWMAL-395-03 | Connected load: 1 MW | 1 site · Report in 2-4 weeks | for verified buyers |
| Connected load5 MWMAL-395-04 | Connected load: 5 MW | 1 site · Report in 2-4 weeks | for verified buyers |
| Connected load10 MWMAL-395-05 | Connected load: 10 MW | 1 site · Report in 2-4 weeks | for verified buyers |
Specifications
| Connected load | 100 kW to 10 MW (see variants) |
|---|---|
| Audit level | Detailed auditmade to order: Walk-through / Investment-grade audit |
| Instruments | Ultrasonic flow meter, lux metermade to order: Power analyser, thermal camera |
| Auditor | Certified Energy Manager |
| Report | Savings opportunities with payback |
| Baseline | 12-month bills analysis |
| Measurement duration | 7 days |
| Coverage | Electricalmade to order: Electrical and thermal / Utilities |
| Statutory | Form-1 and Form-2 filing |
| Deliverable | Report and monitoring planmade to order: Report and presentation |
| Follow-up | Verification after implementation |