Catalogue / Demand response

No photo yet

Aggregation of industrial loads, Flex seriesSample

by Malwa Advisory (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Malwa Advisory (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

The Flex service of aggregation of industrial loads by Malwa covers 5 curtailable load options (0.5 MW to 25 MW). Design: reduced peak demand charges, settlement transparency and integration with plant process limits. Suited to commercial buildings, industrial plants with flexible load and cold storage and water pumping. Delivered in line with CERC DR Guidelines, State TOD Tariff Orders and OpenADR 2.0b. Mobilisation Assessment in 2-3 weeks; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Malwa
Model
MAL-B43 series
Listing type
Service
Unit
MW
Minimum order
1 MW
Lead time
Assessment in 2-3 weeks
Warranty
Performance reporting
Standards
CERC DR Guidelines, State TOD Tariff Orders, OpenADR 2.0b
Delivers to
All India and export (SAARC, Middle East, Africa)
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Curtailable load0.5 MWMAL-B43-01Curtailable load: 0.5 MW1 MW · Assessment in 2-3 weeksfor verified buyers
Curtailable load1 MWMAL-B43-02Curtailable load: 1 MW1 MW · Assessment in 2-3 weeksfor verified buyers
Curtailable load5 MWMAL-B43-03Curtailable load: 5 MW1 MW · Assessment in 2-3 weeksfor verified buyers
Curtailable load10 MWMAL-B43-04Curtailable load: 10 MW1 MW · Enrolment 4-8 weeksfor verified buyers
Curtailable load25 MWMAL-B43-05Curtailable load: 25 MW1 MW · Enrolment 4-8 weeksfor verified buyers

Specifications

Curtailable load0.5 MW to 25 MW (see variants)
ProgrammeUtility DRmade to order: Aggregator DR / TOD optimisation
ControlAutomated through SCADAmade to order: Manual
Notice2 hours
Duration per event1 hour
Events per year50made to order: 20 / Unlimited
MeteringExisting meter
Incentive sharing80:20
Baseline method10-day average
ReportingMonthly savingsmade to order: Event report
Contract term3 yearsmade to order: 1 year

BARREL: Bharat Atom Renewable Resources Energy Limited