Aggregation of industrial loads, Flex seriesSample
by Malwa Advisory (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Malwa Advisory (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
The Flex service of aggregation of industrial loads by Malwa covers 5 curtailable load options (0.5 MW to 25 MW). Design: reduced peak demand charges, settlement transparency and integration with plant process limits. Suited to commercial buildings, industrial plants with flexible load and cold storage and water pumping. Delivered in line with CERC DR Guidelines, State TOD Tariff Orders and OpenADR 2.0b. Mobilisation Assessment in 2-3 weeks; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Malwa
- Model
- MAL-B43 series
- Listing type
- Service
- Unit
- MW
- Minimum order
- 1 MW
- Lead time
- Assessment in 2-3 weeks
- Warranty
- Performance reporting
- Standards
- CERC DR Guidelines, State TOD Tariff Orders, OpenADR 2.0b
- Delivers to
- All India and export (SAARC, Middle East, Africa)
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Curtailable load0.5 MWMAL-B43-01 | Curtailable load: 0.5 MW | 1 MW · Assessment in 2-3 weeks | for verified buyers |
| Curtailable load1 MWMAL-B43-02 | Curtailable load: 1 MW | 1 MW · Assessment in 2-3 weeks | for verified buyers |
| Curtailable load5 MWMAL-B43-03 | Curtailable load: 5 MW | 1 MW · Assessment in 2-3 weeks | for verified buyers |
| Curtailable load10 MWMAL-B43-04 | Curtailable load: 10 MW | 1 MW · Enrolment 4-8 weeks | for verified buyers |
| Curtailable load25 MWMAL-B43-05 | Curtailable load: 25 MW | 1 MW · Enrolment 4-8 weeks | for verified buyers |
Specifications
| Curtailable load | 0.5 MW to 25 MW (see variants) |
|---|---|
| Programme | Utility DRmade to order: Aggregator DR / TOD optimisation |
| Control | Automated through SCADAmade to order: Manual |
| Notice | 2 hours |
| Duration per event | 1 hour |
| Events per year | 50made to order: 20 / Unlimited |
| Metering | Existing meter |
| Incentive sharing | 80:20 |
| Baseline method | 10-day average |
| Reporting | Monthly savingsmade to order: Event report |
| Contract term | 3 yearsmade to order: 1 year |