Catalogue / Energy audits

No photo yet

Thermal and utility energy audit, Core seriesSample

by Malwa Advisory (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Malwa Advisory (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

Malwa Core thermal and utility energy audit, offered in 3 connected load options from 500 kW to 5 MW. Design: payback and ROI ranking, solar and efficiency retrofit options and statutory forms and BEE reporting. Used by industrial plants, PAT designated consumers and commercial buildings. Delivered in line with Energy Conservation Act 2001, BEE Energy Auditor Regulations and IS 14160. Mobilisation Audit in 1-2 weeks; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Malwa
Model
MAL-397 series
Listing type
Service
Unit
site
Minimum order
1 site
Lead time
Audit in 1-2 weeks
Warranty
Clarifications for 6 months
Standards
Energy Conservation Act 2001, BEE Energy Auditor Regulations, IS 14160
Delivers to
All India and export (SAARC, Middle East, Africa)
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Connected load500 kWMAL-397-01Connected load: 500 kW1 site · Audit in 1-2 weeksfor verified buyers
Connected load1 MWMAL-397-02Connected load: 1 MW1 site · Audit in 1-2 weeksfor verified buyers
Connected load5 MWMAL-397-03Connected load: 5 MW1 site · Audit in 1-2 weeksfor verified buyers

Specifications

Connected load500 kW to 5 MW (see variants)
Audit levelInvestment-grade audit
InstrumentsPower analyser, thermal camera
AuditorCertified Energy Managermade to order: BEE accredited energy auditor
ReportImplementation roadmap
Baseline12-month bills analysismade to order: Measured baseline
Measurement duration3 daysmade to order: 7 days / 14 days
CoverageElectricalmade to order: Electrical and thermal / Utilities
StatutoryPAT scheme Form-A
DeliverableReport and presentation
Follow-upVerification after implementationmade to order: Not included

BARREL: Bharat Atom Renewable Resources Energy Limited