Catalogue / GPS clocks & time synchronisation

No photo yet

Slave clock display, Duo 6 seriesSample

by Malwa Power Communications (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Malwa Power Communications (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

The Duo 6 range of slave clock display by Malwa covers 5 output set options (NTP only to PTP + IRIG-B + PPS + serial). Highlights: lightning protection on antenna feed, multi-constellation receiver for reliable lock and redundant power supply input. Suited to phasor measurement units, substation IEDs and protection relays and control centres. Designed and tested to IEEE 1588, IEEE C37.238 and IEC 61850-9-3. Lead time 6-8 weeks; delivers to All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Malwa
Model
MAL-9C9 series
Listing type
Product
Unit
nos
Minimum order
10 nos
Lead time
6-8 weeks
Warranty
24 months from supply
Standards
IEEE 1588, IEEE C37.238, IEC 61850-9-3
Delivers to
All India and export (SAARC, Middle East, Africa)
GST rate
18 %
Country of origin
India
Packaging
Wooden crate, seaworthy
Delivery terms
Ex-works, freight extra at actuals
Returns
No returns on made-to-order items
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Output setNTP onlyMAL-9C9-01Output set: NTP only10 nos · 6-8 weekson quote
Output setNTP + IRIG-BMAL-9C9-02Output set: NTP + IRIG-B10 nos · 6-8 weekson quote
Output setNTP + IRIG-B + 1PPSMAL-9C9-03Output set: NTP + IRIG-B + 1PPS10 nos · 6-8 weekson quote
Output setPTP grandmasterMAL-9C9-04Output set: PTP grandmaster10 nos · 6-8 weekson quote
Output setPTP + IRIG-B + PPS + serialMAL-9C9-05Output set: PTP + IRIG-B + PPS + serial10 nos · 6-8 weekson quote

Specifications

Output setNTP only to PTP + IRIG-B + PPS + serial (see variants)
Time sourceGPS with rubidium holdover
Accuracy±1 µsmade to order: ±100 ns / ±50 ns
Network protocolsPTP IEEE 1588 v2made to order: NTP v4 / SNTP
PTP profileDefault
OutputsContact
Holdover1 µs / 24 hmade to order: Rubidium 1 µs / 7 days
Ethernet ports4made to order: 2
Power supply24-48 VDC
AntennaActive GPS with 30 m cable
DisplayLCD time and status
Operating temperature-20 to 60 °C

BARREL: Bharat Atom Renewable Resources Energy Limited