Catalogue / Grid connectivity & GNA applications
Connectivity application to STU, Max seriesSample
by Malwatarang Consultants (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Malwatarang Consultants (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Malwatarang Max connectivity application to STU, offered in 3 capacity applied options from 100 MW to 500 MW. Design: eligibility check before filing, handling of CTU queries and support for relinquishment and transfer. Typically used for industrial captive generators, renewable developers and storage developers. Delivered in line with CERC (Connectivity and General Network Access) Regulations 2022, CEA (Technical Standards for Connectivity) Regulations and Indian Electricity Grid Code. Mobilisation Filing in 1-2 weeks; serves South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Malwatarang
- Model
- MAL-662 series
- Listing type
- Service
- Unit
- application
- Minimum order
- 1 application
- Lead time
- Filing in 1-2 weeks
- Warranty
- As per contract
- Standards
- CERC (Connectivity and General Network Access) Regulations 2022, CEA (Technical Standards for Connectivity) Regulations, Indian Electricity Grid Code
- Delivers to
- South India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Capacity applied100 MWMAL-662-01 | Capacity applied: 100 MW | 1 application · Filing in 1-2 weeks | for verified buyers |
| Capacity applied250 MWMAL-662-02 | Capacity applied: 250 MW | 1 application · Filing in 1-2 weeks | for verified buyers |
| Capacity applied500 MWMAL-662-03 | Capacity applied: 500 MW | 1 application · Filing in 1-2 weeks | for verified buyers |
Specifications
| Capacity applied | 100 MW to 500 MW (see variants) |
|---|---|
| Application | Bothmade to order: Connectivity / GNA |
| Scope | Document preparation and filingmade to order: End-to-end liaison |
| Bank guarantee | Arranged by client |
| Studies | Grid impact summary |
| Portal handling | CTUIL portal |
| Team | Regulatory lead and engineer |
| Timeline | Filing in 2 weeksmade to order: Approval 3-6 months |
| Technical documents | SLD, land proof, board resolutionmade to order: Switchyard layout and GA drawings |
| Queries | Responded within 2 daysmade to order: Until grant |
| Fee basis | Fixed plus successmade to order: Fixed |