Catalogue / Resource assessment (solar, wind, hydro)
Satellite based long-term solar irradiance study, Eco seriesSample
by Malwatarang Consultants (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Malwatarang Consultants (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Satellite based long-term solar irradiance study from Malwatarang, Eco series: 4 measurement duration options between Desktop study and 12 months. Key features: turbine and module selection input, data quality control and filling and independent bankable estimate. Typically used for wind and solar developers, hybrid project planners and state agencies mapping resource. Delivered in line with IEC 61400-12-1, IEC 61724-1 and IEC 61400-15. Mobilisation Desktop in 2-3 weeks; serves South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Malwatarang
- Model
- MAL-B57 series
- Listing type
- Service
- Unit
- report
- Minimum order
- 1 report
- Lead time
- Desktop in 2-3 weeks
- Warranty
- As per contract
- Standards
- IEC 61400-12-1, IEC 61724-1, IEC 61400-15
- Delivers to
- South India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Measurement durationDesktop studyMAL-B57-01 | Measurement duration: Desktop study | 1 report · Desktop in 2-3 weeks | on quote |
| Measurement duration3 monthsMAL-B57-02 | Measurement duration: 3 months | 1 report · Desktop in 2-3 weeks | on quote |
| Measurement duration6 monthsMAL-B57-03 | Measurement duration: 6 months | 1 report · Campaign 3-24 months | on quote |
| Measurement duration12 monthsMAL-B57-04 | Measurement duration: 12 months | 1 report · Campaign 3-24 months | on quote |
Specifications
| Measurement duration | Desktop study to 12 months (see variants) |
|---|---|
| Technology | Windmade to order: Solar GHI/DNI / Small hydro |
| Data source | Hybrid with MCPmade to order: Satellite and reanalysis / On-site measurement |
| Equipment | 80-120 m met mast with LiDAR |
| Uncertainty | P50/P90 with uncertainty budget |
| Modelling | PVsyst, SAMmade to order: WAsP, WindPRO |
| Deliverable | Resource reportmade to order: Hourly time series dataset |
| Calibration | Traceable calibration |
| Site count | Single site |
| Maintenance | Quarterly site visit |
| Turnaround | Report within 6 weeks of data |