Catalogue / Power system studies (load flow, short circuit, grid code)
Grid code compliance study, Prime seriesSample
by Malwatarang Consultants (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Malwatarang Consultants (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Prime service of grid code compliance study by Malwatarang covers 5 network scale options (11 kV plant to 220 kV system). Key features: models acceptable to STU and CTUIL, reactive power capability curves and relay setting files ready to load. Typically used for BESS integrators, utilities and consultants and renewable developers seeking connectivity. Delivered in line with CEA (Technical Standards for Connectivity) Regulations, Indian Electricity Grid Code and IEEE 1547. Mobilisation Kick-off in 1 week; serves South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Malwatarang
- Model
- MAL-4C9 series
- Listing type
- Service
- Unit
- report
- Minimum order
- 1 report
- Lead time
- Kick-off in 1 week
- Warranty
- Clarifications to utility at no cost
- Standards
- CEA (Technical Standards for Connectivity) Regulations, Indian Electricity Grid Code, IEEE 1547
- Delivers to
- South India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Network scale11 kV plantMAL-4C9-01 | Network scale: 11 kV plant | 1 report · Kick-off in 1 week | on quote |
| Network scale33 kV plantMAL-4C9-02 | Network scale: 33 kV plant | 1 report · Kick-off in 1 week | on quote |
| Network scale66 kV systemMAL-4C9-03 | Network scale: 66 kV system | 1 report · Kick-off in 1 week | on quote |
| Network scale132 kV systemMAL-4C9-04 | Network scale: 132 kV system | 1 report · 2-6 weeks | on quote |
| Network scale220 kV systemMAL-4C9-05 | Network scale: 220 kV system | 1 report · 2-6 weeks | on quote |
Specifications
| Network scale | 11 kV plant to 220 kV system (see variants) |
|---|---|
| Study type | Dynamic and transientmade to order: Load flow and short circuit / Harmonics / Protection coordination |
| Software | PSS/E |
| Model data | Client single line diagram and datamade to order: Utility network model |
| Deliverables | Model files and relay settings |
| Grid code checks | Voltage and reactive power capabilitymade to order: LVRT/HVRT and ramp rate |
| Review | Lender review |
| Scenarios | Normal and N-1made to order: Multiple dispatch cases |
| Team | Power system engineer |
| Turnaround | 4-6 weeksmade to order: 2-3 weeks |
| Validation | Compared with measured datamade to order: Peer review |