Catalogue / Feasibility studies & DPR
Detailed project report for wind and hybrid plants, Ultra seriesSample
by Malwatarang Consultants (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Malwatarang Consultants (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Malwatarang Ultra detailed project report for wind and hybrid plants, offered in 3 project capacity options from 5 MW to 50 MW. Key features: capex and opex benchmarks for Indian market, land, resource and grid fit assessment and lender-format financial model. Used by state agencies, funds and lenders and developers and IPPs. Delivered in line with MNRE Guidelines, CERC Tariff Regulations and IEC 61724-1. Mobilisation Kick-off in 1 week; serves South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Malwatarang
- Model
- MAL-629 series
- Listing type
- Service
- Unit
- report
- Minimum order
- 1 report
- Lead time
- Kick-off in 1 week
- Warranty
- As per contract
- Standards
- MNRE Guidelines, CERC Tariff Regulations, IEC 61724-1
- Delivers to
- South India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Project capacity5 MWMAL-629-01 | Project capacity: 5 MW | 1 report · Kick-off in 1 week | on quote |
| Project capacity10 MWMAL-629-02 | Project capacity: 10 MW | 1 report · Kick-off in 1 week | on quote |
| Project capacity50 MWMAL-629-03 | Project capacity: 50 MW | 1 report · Kick-off in 1 week | on quote |
Specifications
| Project capacity | 5 MW to 50 MW (see variants) |
|---|---|
| Scope | Pre-feasibility |
| Energy yield | WAsP wind energy assessment |
| Financial model | Project IRR, equity IRR, DSCR |
| Grid assessment | GNA/connectivity route study |
| Site visit | Two visits with geotechmade to order: One visit with drone survey |
| Environmental screening | Includedmade to order: Optional add-on |
| Team | Lead consultant and analyst |
| Turnaround | 10-12 weeksmade to order: 3-4 weeks / 6-8 weeks |
| Deliverable | Report, model and presentation |
| Review rounds | Two with client commentsmade to order: One |