Catalogue / Grid connectivity & GNA applications
LTA-to-GNA transition advisory, Edge 6 seriesSample
by Malwatarang Consultants (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Malwatarang Consultants (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
The Edge 6 service of LTA-to-GNA transition advisory by Malwatarang covers 6 capacity applied options (10 MW to 1000 MW). Design: eligibility check before filing, handling of CTU queries and regular updates of queue status. Suited to green hydrogen projects, renewable developers and storage developers. Delivered in line with CERC (Connectivity and General Network Access) Regulations 2022, CEA (Technical Standards for Connectivity) Regulations and Indian Electricity Grid Code. Mobilisation Grant 3-9 months; serves South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Malwatarang
- Model
- MAL-0B9 series
- Listing type
- Service
- Unit
- application
- Minimum order
- 1 application
- Lead time
- Grant 3-9 months
- Warranty
- As per contract
- Standards
- CERC (Connectivity and General Network Access) Regulations 2022, CEA (Technical Standards for Connectivity) Regulations, Indian Electricity Grid Code
- Delivers to
- South India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Capacity applied10 MWMAL-0B9-01 | Capacity applied: 10 MW | 1 application · Grant 3-9 months | for verified buyers |
| Capacity applied50 MWMAL-0B9-02 | Capacity applied: 50 MW | 1 application · Grant 3-9 months | for verified buyers |
| Capacity applied100 MWMAL-0B9-03 | Capacity applied: 100 MW | 1 application · Grant 3-9 months | for verified buyers |
| Capacity applied250 MWMAL-0B9-04 | Capacity applied: 250 MW | 1 application · Grant 3-9 months | for verified buyers |
| Capacity applied500 MWMAL-0B9-05 | Capacity applied: 500 MW | 1 application · Grant 3-9 months | for verified buyers |
| Capacity applied1000 MWMAL-0B9-06 | Capacity applied: 1000 MW | 1 application · Grant 3-9 months | for verified buyers |
Specifications
| Capacity applied | 10 MW to 1000 MW (see variants) |
|---|---|
| Application | Connectivity |
| Scope | Document preparation and filingmade to order: End-to-end liaison |
| Bank guarantee | Arranged by clientmade to order: Arranged through partner bank |
| Studies | Detailed power system study |
| Portal handling | STU portalmade to order: CTUIL portal |
| Team | Regulatory lead and engineermade to order: Dedicated manager |
| Timeline | Approval 3-6 monthsmade to order: Filing in 2 weeks |
| Technical documents | SLD, land proof, board resolution |
| Queries | Until grantmade to order: Responded within 2 days |
| Fee basis | Fixedmade to order: Fixed plus success |