Catalogue / Third-party inspection (TPI)
Solar module and inverter inspection, Volt 5 seriesSample
by Malwavolt Technical Services (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Malwavolt Technical Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
The Volt 5 service of solar module and inverter inspection by Malwavolt covers 3 inspection effort options (20 man-days to 100 man-days). Key features: hold and witness points per QAP, quick mobilisation across India and calibration check of test equipment. Suited to utilities and PSUs, lender quality assurance and EPC contractors and developers. Delivered in line with ISO/IEC 17020, IS 2500 (Sampling Inspection) and IS 2026 (Power Transformers). Mobilisation Report in 24-48 hours; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Malwavolt
- Model
- MAL-AE6 series
- Listing type
- Service
- Unit
- day
- Minimum order
- 1 day
- Lead time
- Report in 24-48 hours
- Warranty
- As per contract
- Standards
- ISO/IEC 17020, IS 2500 (Sampling Inspection), IS 2026 (Power Transformers)
- Delivers to
- All India and export (SAARC, Middle East, Africa)
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Inspection effort20 man-daysMAL-AE6-01 | Inspection effort: 20 man-days | 1 day · Report in 24-48 hours | for verified buyers |
| Inspection effort50 man-daysMAL-AE6-02 | Inspection effort: 50 man-days | 1 day · Report in 24-48 hours | for verified buyers |
| Inspection effort100 man-daysMAL-AE6-03 | Inspection effort: 100 man-days | 1 day · Report in 24-48 hours | for verified buyers |
Specifications
| Inspection effort | 20 man-days to 100 man-days (see variants) |
|---|---|
| Equipment inspected | Cables and conductorsmade to order: Transformers and reactors / Switchgear and relays / PV modules and inverters |
| Inspection stage | In-process |
| Standards used | Per client specification |
| Inspector qualification | Level II NDT certifiedmade to order: B.E. Electrical with 8 years experience |
| Accreditation | ISO/IEC 17020 body |
| Report | Inspection release notemade to order: Detailed report with photos in 48 hours |
| Coverage | Domestic and export vendors |
| Sampling | As per IS 2500 |
| Release note | Hard copy plus scanmade to order: Digital signature |
| Travel | At actuals |