Catalogue / Third-party inspection (TPI)

No photo yet

Solar module and inverter inspection, Flex seriesSample

by Malwavolt Technical Services (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Malwavolt Technical Services (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

Solar module and inverter inspection from Malwavolt, Flex series: 6 inspection effort options between 1 man-day and 100 man-days. Design: hold and witness points per QAP, quick mobilisation across India and independent opinion for buyers. Suited to lender quality assurance, EPC contractors and developers and government procurement. Delivered in line with ISO/IEC 17020, IS 2500 (Sampling Inspection) and IS 2026 (Power Transformers). Mobilisation Report in 24-48 hours; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Malwavolt
Model
MAL-AE3 series
Listing type
Service
Unit
day
Minimum order
1 day
Lead time
Report in 24-48 hours
Warranty
Re-inspection at no cost for disputed lots
Standards
ISO/IEC 17020, IS 2500 (Sampling Inspection), IS 2026 (Power Transformers)
Delivers to
All India and export (SAARC, Middle East, Africa)
GST rate
18 %
Country of origin
India (imported sub-assemblies)
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Inspection effort1 man-dayMAL-AE3-01Inspection effort: 1 man-day1 day · Report in 24-48 hoursfor verified buyers
Inspection effort5 man-daysMAL-AE3-02Inspection effort: 5 man-days1 day · Report in 24-48 hoursfor verified buyers
Inspection effort10 man-daysMAL-AE3-03Inspection effort: 10 man-days1 day · Report in 24-48 hoursfor verified buyers
Inspection effort20 man-daysMAL-AE3-04Inspection effort: 20 man-days1 day · Report in 24-48 hoursfor verified buyers
Inspection effort50 man-daysMAL-AE3-05Inspection effort: 50 man-days1 day · Report in 24-48 hoursfor verified buyers
Inspection effort100 man-daysMAL-AE3-06Inspection effort: 100 man-days1 day · Report in 24-48 hoursfor verified buyers

Specifications

Inspection effort1 man-day to 100 man-days (see variants)
Equipment inspectedTowers and structures
Inspection stageIn-processmade to order: Raw material / Final pre-dispatch
Standards usedPer client specificationmade to order: Per approved QAP
Inspector qualificationB.E. Electrical with 8 years experience
AccreditationISO/IEC 17020 body
ReportDetailed report with photos in 48 hours
CoverageDomestic and export vendors
SamplingAs per IS 2500made to order: AQL level II
Release noteHard copy plus scan
TravelIncluded in rate

BARREL: Bharat Atom Renewable Resources Energy Limited