Catalogue / Third-party inspection (TPI)
Solar module and inverter inspection, Flex seriesSample
by Malwavolt Technical Services (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Malwavolt Technical Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Solar module and inverter inspection from Malwavolt, Flex series: 6 inspection effort options between 1 man-day and 100 man-days. Design: hold and witness points per QAP, quick mobilisation across India and independent opinion for buyers. Suited to lender quality assurance, EPC contractors and developers and government procurement. Delivered in line with ISO/IEC 17020, IS 2500 (Sampling Inspection) and IS 2026 (Power Transformers). Mobilisation Report in 24-48 hours; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Malwavolt
- Model
- MAL-AE3 series
- Listing type
- Service
- Unit
- day
- Minimum order
- 1 day
- Lead time
- Report in 24-48 hours
- Warranty
- Re-inspection at no cost for disputed lots
- Standards
- ISO/IEC 17020, IS 2500 (Sampling Inspection), IS 2026 (Power Transformers)
- Delivers to
- All India and export (SAARC, Middle East, Africa)
- GST rate
- 18 %
- Country of origin
- India (imported sub-assemblies)
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Inspection effort1 man-dayMAL-AE3-01 | Inspection effort: 1 man-day | 1 day · Report in 24-48 hours | for verified buyers |
| Inspection effort5 man-daysMAL-AE3-02 | Inspection effort: 5 man-days | 1 day · Report in 24-48 hours | for verified buyers |
| Inspection effort10 man-daysMAL-AE3-03 | Inspection effort: 10 man-days | 1 day · Report in 24-48 hours | for verified buyers |
| Inspection effort20 man-daysMAL-AE3-04 | Inspection effort: 20 man-days | 1 day · Report in 24-48 hours | for verified buyers |
| Inspection effort50 man-daysMAL-AE3-05 | Inspection effort: 50 man-days | 1 day · Report in 24-48 hours | for verified buyers |
| Inspection effort100 man-daysMAL-AE3-06 | Inspection effort: 100 man-days | 1 day · Report in 24-48 hours | for verified buyers |
Specifications
| Inspection effort | 1 man-day to 100 man-days (see variants) |
|---|---|
| Equipment inspected | Towers and structures |
| Inspection stage | In-processmade to order: Raw material / Final pre-dispatch |
| Standards used | Per client specificationmade to order: Per approved QAP |
| Inspector qualification | B.E. Electrical with 8 years experience |
| Accreditation | ISO/IEC 17020 body |
| Report | Detailed report with photos in 48 hours |
| Coverage | Domestic and export vendors |
| Sampling | As per IS 2500made to order: AQL level II |
| Release note | Hard copy plus scan |
| Travel | Included in rate |