Catalogue / Electrical safety audits

No photo yet

Fire and arc-flash risk assessment, Volt seriesSample

by Malwavolt Technical Services (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Malwavolt Technical Services (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

Malwavolt Volt fire and arc-flash risk assessment, offered in 5 installed load options from 1 MVA to 50 MVA. Design: compliance matrix against CEA safety rules, risk-ranked findings and earthing health and soil resistivity. Suited to data centres, manufacturing plants and hospitals and commercial buildings. Delivered in line with Indian Electricity Act 2003, CEA (Measures relating to Safety) Regulations and IS 5216. Mobilisation Audit in 1-2 weeks; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Malwavolt
Model
MAL-2D4 series
Listing type
Service
Unit
site
Minimum order
1 site
Lead time
Audit in 1-2 weeks
Warranty
Clarifications on report at no cost for 6 months
Standards
Indian Electricity Act 2003, CEA (Measures relating to Safety) Regulations, IS 5216
Delivers to
All India and export (SAARC, Middle East, Africa)
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Installed load1 MVAMAL-2D4-01Installed load: 1 MVA1 site · Audit in 1-2 weeksfor verified buyers
Installed load5 MVAMAL-2D4-02Installed load: 5 MVA1 site · Audit in 1-2 weeksfor verified buyers
Installed load10 MVAMAL-2D4-03Installed load: 10 MVA1 site · Audit in 1-2 weeksfor verified buyers
Installed load25 MVAMAL-2D4-04Installed load: 25 MVA1 site · Report in 7-14 daysfor verified buyers
Installed load50 MVAMAL-2D4-05Installed load: 50 MVA1 site · Report in 7-14 daysfor verified buyers

Specifications

Installed load1 MVA to 50 MVA (see variants)
ScopeAudit with arc-flash study
AuditorCEA-licensed engineermade to order: Chartered engineer
MeasurementsEarth resistance, insulation
ReportAction plan with timelinemade to order: Findings with risk rating
Statutory recordsPermit-to-work audit
Sampling100% of HV equipmentmade to order: Representative LV panels
Follow-upClose-out verification
Turnaround3-4 weeks
PresentationReport only
AccreditationGovernment recognised agency

BARREL: Bharat Atom Renewable Resources Energy Limited