Catalogue / Electrical safety audits
Fire and arc-flash risk assessment, Volt seriesSample
by Malwavolt Technical Services (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Malwavolt Technical Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Malwavolt Volt fire and arc-flash risk assessment, offered in 5 installed load options from 1 MVA to 50 MVA. Design: compliance matrix against CEA safety rules, risk-ranked findings and earthing health and soil resistivity. Suited to data centres, manufacturing plants and hospitals and commercial buildings. Delivered in line with Indian Electricity Act 2003, CEA (Measures relating to Safety) Regulations and IS 5216. Mobilisation Audit in 1-2 weeks; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Malwavolt
- Model
- MAL-2D4 series
- Listing type
- Service
- Unit
- site
- Minimum order
- 1 site
- Lead time
- Audit in 1-2 weeks
- Warranty
- Clarifications on report at no cost for 6 months
- Standards
- Indian Electricity Act 2003, CEA (Measures relating to Safety) Regulations, IS 5216
- Delivers to
- All India and export (SAARC, Middle East, Africa)
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Installed load1 MVAMAL-2D4-01 | Installed load: 1 MVA | 1 site · Audit in 1-2 weeks | for verified buyers |
| Installed load5 MVAMAL-2D4-02 | Installed load: 5 MVA | 1 site · Audit in 1-2 weeks | for verified buyers |
| Installed load10 MVAMAL-2D4-03 | Installed load: 10 MVA | 1 site · Audit in 1-2 weeks | for verified buyers |
| Installed load25 MVAMAL-2D4-04 | Installed load: 25 MVA | 1 site · Report in 7-14 days | for verified buyers |
| Installed load50 MVAMAL-2D4-05 | Installed load: 50 MVA | 1 site · Report in 7-14 days | for verified buyers |
Specifications
| Installed load | 1 MVA to 50 MVA (see variants) |
|---|---|
| Scope | Audit with arc-flash study |
| Auditor | CEA-licensed engineermade to order: Chartered engineer |
| Measurements | Earth resistance, insulation |
| Report | Action plan with timelinemade to order: Findings with risk rating |
| Statutory records | Permit-to-work audit |
| Sampling | 100% of HV equipmentmade to order: Representative LV panels |
| Follow-up | Close-out verification |
| Turnaround | 3-4 weeks |
| Presentation | Report only |
| Accreditation | Government recognised agency |