Catalogue / Civil & foundation works

No photo yet

Pile foundations for module mounting structures, Pro 6 seriesSample

by Maurya Logistics (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Maurya Logistics (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

Maurya Pro 6 pile foundations for module mounting structures, offered in 6 works volume options from 1 MW equivalent to 100 MW equivalent. Highlights: daily quantity and progress log, waterproofing for cable trenches and monsoon-ready drainage planning. Suited to industrial plants, solar parks and wind farms. Delivered in line with IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations) and IS 1893 (Seismic Design). Mobilisation 4-12 weeks execution; serves East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Maurya
Model
MAU-1C3 series
Listing type
Service
Unit
job
Minimum order
1 job
Lead time
4-12 weeks execution
Warranty
Pile load test certified
Standards
IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations), IS 1893 (Seismic Design)
Delivers to
East & North-East India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Works volume1 MW equivalentMAU-1C3-01Works volume: 1 MW equivalent1 job · 4-12 weeks executionfor verified buyers
Works volume5 MW equivalentMAU-1C3-02Works volume: 5 MW equivalent1 job · 4-12 weeks executionfor verified buyers
Works volume10 MW equivalentMAU-1C3-03Works volume: 10 MW equivalent1 job · 4-12 weeks executionfor verified buyers
Works volume25 MW equivalentMAU-1C3-04Works volume: 25 MW equivalent1 job · 4-12 weeks executionfor verified buyers
Works volume50 MW equivalentMAU-1C3-05Works volume: 50 MW equivalent1 job · 4-12 weeks executionfor verified buyers
Works volume100 MW equivalentMAU-1C3-06Works volume: 100 MW equivalent1 job · 4-12 weeks executionfor verified buyers

Specifications

Works volume1 MW equivalent to 100 MW equivalent (see variants)
Foundation typeRamming or screw pile
Concrete gradeM25
Pull-out testingRandom test plus lateral load
ReinforcementFe 550Dmade to order: Fe 500D TMT
Roads and drainageNot includedmade to order: Murram road, 4 m wide / WBM road with culverts
BoundaryCompound wall with barbed wiremade to order: Chain link fence 2.4 m
QualityCube test reports per pour
MachineryPiling rigs and excavators
Duration3-6 monthsmade to order: 4-8 weeks
Payment termsItem rate with retentionmade to order: Measured running bills

BARREL: Bharat Atom Renewable Resources Energy Limited