Catalogue / Cabling, trenching & HDD works
HT cable jointing and termination, Elite seriesSample
by Maurya Logistics (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Maurya Logistics (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
The Elite service of HT cable jointing and termination by Maurya covers 6 cable route length options (1 km to 50 km). Highlights: traffic management at crossings, dewatering in high water table and drum handling and pulling tension control. Suited to railway and highway crossings, urban distribution upgrades and renewable plant internal networks. Delivered in line with IS 1255 (Cable Installation), IS 7098 (XLPE Cables) and IEC 60840. Mobilisation Permits may extend timeline; serves East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Maurya
- Model
- MAU-1C2 series
- Listing type
- Service
- Unit
- km
- Minimum order
- 1 km
- Lead time
- Permits may extend timeline
- Warranty
- Restoration warranty 6 months
- Standards
- IS 1255 (Cable Installation), IS 7098 (XLPE Cables), IEC 60840
- Delivers to
- East & North-East India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Cable route length1 kmMAU-1C2-01 | Cable route length: 1 km | 1 km · Permits may extend timeline | for verified buyers |
| Cable route length2 kmMAU-1C2-02 | Cable route length: 2 km | 1 km · Permits may extend timeline | for verified buyers |
| Cable route length5 kmMAU-1C2-03 | Cable route length: 5 km | 1 km · Permits may extend timeline | for verified buyers |
| Cable route length10 kmMAU-1C2-04 | Cable route length: 10 km | 1 km · Permits may extend timeline | for verified buyers |
| Cable route length20 kmMAU-1C2-05 | Cable route length: 20 km | 1 km · Permits may extend timeline | for verified buyers |
| Cable route length50 kmMAU-1C2-06 | Cable route length: 50 km | 1 km · Permits may extend timeline | for verified buyers |
Specifications
| Cable route length | 1 km to 50 km (see variants) |
|---|---|
| Method | Trench plus HDD for crossings |
| HDD capacity | Up to 250 mm boremade to order: Up to 450 mm bore |
| Trench depth | 0.9 m |
| Cable type | 11/33 kV XLPEmade to order: LT armoured |
| Jointing | Heat shrinkmade to order: Cold shrink / Premoulded |
| Restoration | Backfill and compaction only |
| Permissions | Client arranges |
| Testing | Insulation and VLF testmade to order: Hipot and sheath test |
| Productivity | 50 m per day HDDmade to order: 300 m per day open trench |
| Crew | Trenching team of 15made to order: HDD crew of 8 with rig |