Catalogue / Installation & erection
Turbine tower and nacelle erection support, Flex seriesSample
by Maurya Logistics (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Maurya Logistics (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Turbine tower and nacelle erection support from Maurya, Flex series: 6 installation scope options between 1 MW and 100 MW. Highlights: material reconciliation reports, module handling to avoid micro-cracks and torque-verified structure and module fixing. Typically used for utility solar parks, hybrid projects and c&I rooftop and ground mount. Delivered in line with IS 732 (Electrical Wiring), IEC 62548 and CEA (Measures relating to Safety) Regulations. Mobilisation Mobilisation in 10 days; serves East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Maurya
- Model
- MAU-C43 series
- Listing type
- Service
- Unit
- MW
- Minimum order
- 1 MW
- Lead time
- Mobilisation in 10 days
- Warranty
- Defect liability 24 months
- Standards
- IS 732 (Electrical Wiring), IEC 62548, CEA (Measures relating to Safety) Regulations
- Delivers to
- East & North-East India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Installation scope1 MWMAU-C43-01 | Installation scope: 1 MW | 1 MW · Mobilisation in 10 days | for verified buyers |
| Installation scope5 MWMAU-C43-02 | Installation scope: 5 MW | 1 MW · Mobilisation in 10 days | for verified buyers |
| Installation scope10 MWMAU-C43-03 | Installation scope: 10 MW | 1 MW · Mobilisation in 10 days | for verified buyers |
| Installation scope25 MWMAU-C43-04 | Installation scope: 25 MW | 1 MW · Mobilisation in 10 days | for verified buyers |
| Installation scope50 MWMAU-C43-05 | Installation scope: 50 MW | 1 MW · Phased by block | for verified buyers |
| Installation scope100 MWMAU-C43-06 | Installation scope: 100 MW | 1 MW · Phased by block | for verified buyers |
Specifications
| Installation scope | 1 MW to 100 MW (see variants) |
|---|---|
| Scope | Electrical BoP erection |
| Manpower deployed | 60 technicians plus supervisorsmade to order: 25 technicians per MW-block / Peak crew of 200 |
| Supervision | Site engineer and safety officermade to order: Project manager, engineers, QA/QC |
| Equipment | Pile driver, crane, telehandlermade to order: Own cranes and erection tools |
| Quality plan | Client-approved ITPmade to order: ISO 9001 QAP with hold points |
| Safety | Lost-time-injury-free target, HIRAmade to order: Daily toolbox talks, PPE, permits |
| Licence | Electrical contractor licence |
| Insurance | CAR and workmen compensationmade to order: CAR, WC and third-party liability |
| Reporting | Daily progress reportmade to order: Weekly report with look-ahead plan |
| Payment terms | Monthly running bills |