Catalogue / Testing & commissioning
Solar plant commissioning and performance ratio test, Eco 3 seriesSample
by Maurya Logistics (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Maurya Logistics (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Eco 3 service of solar plant commissioning and performance ratio test by Maurya covers 5 plant capacity options (5 MW to 100 MW). Key features: live relay setting verification, handover training to O&M team and commissioning certificates for lenders. Suited to repowering projects, EPC handover to owners and DISCOM and STU charging. Delivered in line with IEC 62446-1, IEC 61724-1 and CEA (Technical Standards for Connectivity) Regulations. Mobilisation Mobilisation in 5 days; serves East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Maurya
- Model
- MAU-9A2 series
- Listing type
- Service
- Unit
- MW
- Minimum order
- 1 MW
- Lead time
- Mobilisation in 5 days
- Warranty
- As per contract
- Standards
- IEC 62446-1, IEC 61724-1, CEA (Technical Standards for Connectivity) Regulations
- Delivers to
- East & North-East India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Plant capacity5 MWMAU-9A2-01 | Plant capacity: 5 MW | 1 MW · Mobilisation in 5 days | on quote |
| Plant capacity10 MWMAU-9A2-02 | Plant capacity: 10 MW | 1 MW · Mobilisation in 5 days | on quote |
| Plant capacity25 MWMAU-9A2-03 | Plant capacity: 25 MW | 1 MW · Mobilisation in 5 days | on quote |
| Plant capacity50 MWMAU-9A2-04 | Plant capacity: 50 MW | 1 MW · Report in 7 days | on quote |
| Plant capacity100 MWMAU-9A2-05 | Plant capacity: 100 MW | 1 MW · Report in 7 days | on quote |
Specifications
| Plant capacity | 5 MW to 100 MW (see variants) |
|---|---|
| Tests covered | Full plant functional and PR testmade to order: String IV curve, insulation, earth / Transformer, switchgear, relay tests |
| Instruments | Relay test set, thermal cameramade to order: Calibrated IV tracer, megger, CRM |
| Calibration | Calibration valid at test date |
| Team | Lead plus 5 member crew |
| Statutory support | DISCOM charging supportmade to order: CEIG inspection coordination |
| Reports | Commissioning dossier with as-builtmade to order: Test reports with signed formats |
| Duration on site | 10-14 days |
| Performance guarantee test | Capacity and PR test per contract |
| Grid code checks | Not includedmade to order: Reactive power and ramp rate |
| Payment | 50% on start, 50% on reportmade to order: Milestone on energisation |