Catalogue / Engineering & design

No photo yet

Substation and evacuation system design, Neo 6 seriesSample

by Maurya Logistics (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Maurya Logistics (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

Maurya Neo 6 substation and evacuation system design, offered in 4 plant capacity options from 25 MW to 250 MW. Key features: cable sizing and voltage drop calculations, layout optimisation for land and shading and yield and loss modelling aligned to bankable reports. Used by IPPs and developers, lender technical reviews and captive and C&I solar owners. Delivered in line with CEA (Technical Standards for Connectivity) Regulations, IEC 62548 and IS 3043 (Earthing). Mobilisation 6-10 weeks; serves East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Maurya
Model
MAU-A22 series
Listing type
Service
Unit
job
Minimum order
1 job
Lead time
6-10 weeks
Warranty
As per contract
Standards
CEA (Technical Standards for Connectivity) Regulations, IEC 62548, IS 3043 (Earthing)
Delivers to
East & North-East India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Plant capacity25 MWMAU-A22-01Plant capacity: 25 MW1 job · 6-10 weeksfor verified buyers
Plant capacity50 MWMAU-A22-02Plant capacity: 50 MW1 job · 6-10 weeksfor verified buyers
Plant capacity100 MWMAU-A22-03Plant capacity: 100 MW1 job · 6-10 weeksfor verified buyers
Plant capacity250 MWMAU-A22-04Plant capacity: 250 MW1 job · 6-10 weeksfor verified buyers

Specifications

Plant capacity25 MW to 250 MW (see variants)
DeliverablesDesign basis report plus drawingsmade to order: GA drawings, SLD, BoQ / Full IFC drawing set with calculations
Design softwarePVsyst, STAAD, ETAP, Civil 3D
TeamLead engineer plus 3 designersmade to order: Electrical, civil and SCADA discipline leads
Turnaround6-8 weeksmade to order: 3-4 weeks / 10-12 weeks
Revisions included3 rounds
Authority submission supportNone
Earthing and LA studyOptional add-on
FormatPDF, CAD and BIM model
Site visitOne visit included
Payment milestones30% advance, 40% on drafts, 30% on IFC

BARREL: Bharat Atom Renewable Resources Energy Limited