Catalogue / Energy audits

No photo yet

Mandatory energy audit for designated consumers, Neo seriesSample

by Mewar Associates (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Mewar Associates (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Mandatory energy audit for designated consumers from Mewar, Neo series: 6 connected load options between 100 kW and 25 MW. Design: statutory forms and BEE reporting, verification after implementation and power factor and harmonics assessment. Used by PAT designated consumers, hospitals and hotels and industrial plants. Delivered in line with Energy Conservation Act 2001, BEE Energy Auditor Regulations and IS 14160. Mobilisation Report in 2-4 weeks; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Mewar
Model
MEW-A73 series
Listing type
Service
Unit
site
Minimum order
1 site
Lead time
Report in 2-4 weeks
Warranty
Savings estimate accuracy within agreed band
Standards
Energy Conservation Act 2001, BEE Energy Auditor Regulations, IS 14160
Delivers to
All India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Connected load100 kWMEW-A73-01Connected load: 100 kW1 site · Report in 2-4 weekson quote
Connected load500 kWMEW-A73-02Connected load: 500 kW1 site · Report in 2-4 weekson quote
Connected load1 MWMEW-A73-03Connected load: 1 MW1 site · Report in 2-4 weekson quote
Connected load5 MWMEW-A73-04Connected load: 5 MW1 site · Report in 2-4 weekson quote
Connected load10 MWMEW-A73-05Connected load: 10 MW1 site · Report in 2-4 weekson quote
Connected load25 MWMEW-A73-06Connected load: 25 MW1 site · Report in 2-4 weekson quote

Specifications

Connected load100 kW to 25 MW (see variants)
Audit levelDetailed auditmade to order: Walk-through / Investment-grade audit
InstrumentsUltrasonic flow meter, lux metermade to order: Power analyser, thermal camera
AuditorBEE accredited energy auditor
ReportImplementation roadmapmade to order: Savings opportunities with payback
Baseline12-month bills analysismade to order: Measured baseline
Measurement duration7 days
CoverageElectrical
StatutoryForm-1 and Form-2 filing
DeliverableReport and monitoring planmade to order: Report and presentation
Follow-upNot includedmade to order: Verification after implementation

BARREL: Bharat Atom Renewable Resources Energy Limited