Mandatory energy audit for designated consumers, Neo seriesSample
by Mewar Associates (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Mewar Associates (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Mandatory energy audit for designated consumers from Mewar, Neo series: 6 connected load options between 100 kW and 25 MW. Design: statutory forms and BEE reporting, verification after implementation and power factor and harmonics assessment. Used by PAT designated consumers, hospitals and hotels and industrial plants. Delivered in line with Energy Conservation Act 2001, BEE Energy Auditor Regulations and IS 14160. Mobilisation Report in 2-4 weeks; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Mewar
- Model
- MEW-A73 series
- Listing type
- Service
- Unit
- site
- Minimum order
- 1 site
- Lead time
- Report in 2-4 weeks
- Warranty
- Savings estimate accuracy within agreed band
- Standards
- Energy Conservation Act 2001, BEE Energy Auditor Regulations, IS 14160
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Connected load100 kWMEW-A73-01 | Connected load: 100 kW | 1 site · Report in 2-4 weeks | on quote |
| Connected load500 kWMEW-A73-02 | Connected load: 500 kW | 1 site · Report in 2-4 weeks | on quote |
| Connected load1 MWMEW-A73-03 | Connected load: 1 MW | 1 site · Report in 2-4 weeks | on quote |
| Connected load5 MWMEW-A73-04 | Connected load: 5 MW | 1 site · Report in 2-4 weeks | on quote |
| Connected load10 MWMEW-A73-05 | Connected load: 10 MW | 1 site · Report in 2-4 weeks | on quote |
| Connected load25 MWMEW-A73-06 | Connected load: 25 MW | 1 site · Report in 2-4 weeks | on quote |
Specifications
| Connected load | 100 kW to 25 MW (see variants) |
|---|---|
| Audit level | Detailed auditmade to order: Walk-through / Investment-grade audit |
| Instruments | Ultrasonic flow meter, lux metermade to order: Power analyser, thermal camera |
| Auditor | BEE accredited energy auditor |
| Report | Implementation roadmapmade to order: Savings opportunities with payback |
| Baseline | 12-month bills analysismade to order: Measured baseline |
| Measurement duration | 7 days |
| Coverage | Electrical |
| Statutory | Form-1 and Form-2 filing |
| Deliverable | Report and monitoring planmade to order: Report and presentation |
| Follow-up | Not includedmade to order: Verification after implementation |